Laserfiche WebLink
O, : \\ <br /> ( CITY of ORONO <br /> ,, A V,`\„� 1' .u'r ', ' l �, Municipal Offices <br /> Street Address: Mailing Address: <br /> \x 2750 Kelley Parkway P.O. Box 66 <br /> _?_ass¢�%' <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> III ' ro ,L / <br /> To: The Current Owner of Address °,5 G`a a i S� C"f-1 S -r-14 1 g A l i <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imriinent Public Health Threat <br /> Yes V <br /> No <br /> If yes, please contact he Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of thi notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes ✓ <br /> No <br /> If Yes, system must be brought into compliance by: <br /> December 31,2007 <br /> Diecember 31,2010 <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes <br /> No <br /> The City recommend the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> C-( 1-C) 3 . The tank(s) should be cleaned through the manhole and <br /> not through the inspedtion pipes,this allows for proper cleaning. <br /> Comments: <br /> • <br /> Inspe - ' r . r I / Date of Inspection /0 . O..5 . <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br /> II <br />