My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01343 - new structure
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0500 Old Crystal Bay Road South - 04-117-23-42-0029 - New PID (Division - Was: 540 Old Crystal Bay Rd S)
>
Permits/Inspections
>
2016-01343 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:12:21 PM
Creation date
3/23/2018 1:49:10 PM
Metadata
Fields
Template:
x Address Old
Address
0500 Old Crystal Bay Rd S
Document Type
Permits/Inspections
PIN
0411723420029
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
builderAcknowledgement ement Form <br /> g <br /> Permit #2016-01343 / 500 Old Crystal Bay Road S <br /> BuilderC <br /> p a resentative Name: moi( g /1‘7 <br /> Permit Conditions: Initials <br /> **NOTE CHANGE** Before scheduling an exterior insulation and/or drain tile inspection,a <br /> foundation as-built survey mut be submitted and approved by the City or a Stop Work order <br /> will be issued. C <br /> Schedule a minimum of one hdur for the framing inspection. <br /> Erosion control mechanisms mlust be installed and inspected by the City prior to any land <br /> disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to <br /> inspection. C <br /> Erosion control shall be install d and maintained throughout the entire project and must <br /> remain until vegetation has been established. c w <br /> A haul route shall be submitted to the City Engineer for approval and inspection prior to <br /> commencement of hauling from the site.The property owner shall be responsible for cleaning <br /> and repair of roadways for any adverse impacts. C A/ <br /> No underground sewer within 70 feet of well. / <br /> Gly" <br /> Prior to the issuance of a Certificate of Occupancy an as-built survey and hardcover calculations / <br /> must be submitted and approveid. <br /> In the event of winter or other extended unfavorable weather conditions(which prevent the <br /> completion of the exterior improvements and/or as-built survey)a Temporary Certificate of <br /> Occupancy(TCO) may be necessary. A TCO requires a $10,000 escrow. 6.11/ <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios,grading,sidewalks, retaining <br /> walls,etc. not currently shown oh the approved survey and landscaping plan will require a <br /> separate Zoning Permit application to be submitted and approved prior to the work <br /> commencing. rid/ <br /> Any retaining walls that are over 11-feet in height or tiered walls not separated by twice of the <br /> height of the lower wall require engineered plans and a building permit to be submitted and <br /> approved prior to construction. <br /> w:\street fil@s\old crystal bay rd s\600\builder acknowledgement form 2016-01343.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.