Laserfiche WebLink
TRENCH ANO BED WORKSHEET <br /> 1. AVERAGE DESIGN FLOW A-t: Estimated Sewage Flows In Gallons per Day <br /> A. Estimated Li 50 • •d(see figure A-1) number of <br /> or measured x las(8a - •ctor)_ gpd bedrooms Class I Class II Class Ill Class IV <br /> B. Septic tank capacity ' 0 c./ a,a allons(see figure C-1) 2 430050 33000 218 of�the <br /> e <br /> u S f. t St,O 'vasal r44 t l-trvvtip, - - .0.\ 500,3„1-i'rkels, 4 600 375 256 values <br /> -"014-V 4- /0019 'C)oSllab (-Week') ,1154- *--.1_, 5 750 450 294 In the <br /> 2. SOILS (Site evaluation data) 6 goo 525 332 Class I, <br /> C. Depth to restricting layer= feet 7 1050 600 370 u,or III <br /> 8 1200 675 408 columns. <br /> D. Max depth o system Item 2C- ft= ft-3 ft= ft <br /> E. Texture ercolation rate ') •S MPI <br /> F. Soil Sizing Factor(SSF) _sqft/gpd(see figure D-15) <br /> G. %Land Slope % Gi:Septic Tank Can.dties cin gallons) <br /> 3. TRENCH or BED BOTTOM AREA Number of Minimum Liquid Liquid capacity with Liquid capacity <br /> Bedrooms Capacity p ag with dil& <br /> Bed <br /> H. For trenches with 6 inches of rock below the pipe: lift inside <br /> A x F= gpd x sq t/gpd= sqft 2 or less 750 1125 1500 <br /> I. For trenches with 12 inches of r k below the pipe: 5 or 6 1500 1500 0 2000 <br /> A x F x 0.8= gpd x sgft/gpd x 0.8= sqft 7,8 or 9 2000 3030 _ 4000 <br /> j. For trenches with 18 inches of r k below the pipe: <br /> A x F x 0.66= gpd x , sqft/gpd x 0.66= sqft Fetor(ooll Characteristics> aand Soil Sizing <br /> K. For trenches with 24 inches of r k below the pipe: Percolation Rate sou Slairta Factor <br /> inlnutn per Inch sou Texture .quare feet/gadore <br /> A x F x 0.6= gpd x sqft/gpd x 0.6= sqft cmpit perday(sgft/xpd) <br /> L. For gravitybeds with 6 or 12 in es of rock below the pipe;e; faster than 04° coarse sand 0.33 <br /> 1" p 0.1 to s Medium sand 043 <br /> 1.5 x A x F= 1.5 x_gpd x sqft/gpd= sqft 0,1 t,,» p1'j Nand 1.67 <br /> For pressure beds with 6 or 12 in es of rock below the pipe; i to <br /> 30 Loam <br /> _Viola. !'� <br /> A x F= y So gpd x a. sq /gpd= 70 0 sqft 31sers_____- .. <br /> 46 to a0 Gay loam 2.20 <br /> Sandy clay <br /> 4. DISTRIBUTION(Check all that a ly) Cl yd'y <br /> over 61 to 1�••• CV 4.20 <br /> Sandy clay <br /> Bed (<6%slope) Drop b es(any slope) V Rock slower than 1 silty clay <br /> Trenches Distrib 'on box(<3%) Chamber •u.estems for n dl <br /> •Y y permeable awls <br /> I Pressure Gravity Gravelless pressure dber%utlanor serial diaail,unon with <br /> no bench a25%or the total system. <br /> "soil oun 30%or mon fine sand plus very fine sand. cl C( ,`, <br /> "'A mound mustbe sand. <br /> 5. SYSTEM WIDTH,LENGTH and I VOLUME `A"o°"'or performance system must be used <br /> M. Select trench width= ft D-9: Soil Characteristics and Soil sizing <br /> N. If using rock,divide bottom area by width: (H,I,LK or L)+M= facto <br /> n for Graveness Pipe <br /> percolatlon rate <br /> urinal feet/ <br /> c;)(7 0 sqft+ ft= j lineal feet iminutes/irtchl soil texture gallon/day <br /> Rock depth below distritrution pipe plus 0.5 foot times bottom area: Fater than 0.1• coarse Sand — <br /> 0.1 to 5 Medium sand 0.28 <br /> f <br /> Rock depth in et+0 eet x A a(H,I,J,K,or L) i 0.mFine ysand <br /> ( /.O ft+0 )x 900 sqft 119 O cult 6 to 15 Sandy NL art• 0� <br /> Loarn <br /> Volume in cubic yards=volume in cuft divided by 27 331 to <br /> Slit 067 <br /> Silt <br /> I 1 C)0 cuft+27= LI 3 cuyds 46 t0 6o Clay Loam(CL) 0.74 <br /> SandWeight of rock in tons=cubic ya ds times 1.4 <br /> slower that 60'•' tyy�C,L <br /> cls <br /> `}3 cuyds x 1.4= (op ns Sandyay — <br /> O. If using 10"Gravelless Pipe, FlOw(A)x Gravelless SSF(see figure D-9) <br /> Silty Clay <br /> 'Soil too coarse for sewagetreatment. <br /> gpd x linealfeet/gpd= lineal feet Use systems for rapidpermeable soils. <br /> P. If using Chambers,H,I,J,or K(based on height of chamber slats)+ du h.vfnto oxgh a per lime sandf day <br /> fine sand. <br /> gh 'Sou with Too high a penmtage of clay for <br /> width of chamber in feet(M) butallatlon of a standard inground system. <br /> sqft+ ft= ; lineal feet , deatii.rair <br /> T/7�ta-^°,wsa2,�,St ra.wc... <br /> 6. LAWN AREA �.�� . pi o <br /> alt , <br /> sA <br /> Q. Select trench spacing,center to canter= feet *"y� d"'`.�.q <br /> R. Multiply trench spacing by linealjfeet R x Q=sqft of lawn area '" � <br /> ft x lineal feet= 9 O sqft t-t - 'r x- ti-4t= 6-24•Rock 1) <br /> A..,,,,�Y .tf.r,i 3/421/2" a <br /> 7. LAYOUT <br /> Me mde, <br /> `} <br /> Include a drawing with scale(one inch= ,.C) feet). Show pertinent property boundaries,rights-of-way,ease- <br /> ments, location of house,garage,driveway,and all other improvements, existing or proposed soil treatment system, <br /> well and dimensions of all elevations,setbacks and separation distances. <br /> I hereby certify that I have completed this work in accordance with applicable ordinances, rules and laws. <br /> - P- •— (signature) 39 y. (license#) 9—a\--1 -O -2— (date) <br />