My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-00300 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0335 Old Crystal Bay Road South - 04-117-23-24-0003
>
Permits/Inspections
>
2013-00300 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:11:53 PM
Creation date
3/22/2018 1:03:43 PM
Metadata
Fields
Template:
x Address Old
Address
0335 Old Crystal Bay Rd S
Document Type
Permits/Inspections
PIN
0411723240003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Superior Construction Services Inc. <br /> SUPERIOR <br /> ConlsTRUCTIO �avlcEs 9702 85th Ave North <br /> e <br /> 4 Maple Grove,MN 55369 <br /> Phone (763)424-9434 Fax (763)424-5428 <br /> Federal lD#41-1766131 MN ID#7231 <br /> CONTINUED-Bedroom <br /> DESCRIPTION QNTY REMOVE REPLACE TOTAL <br /> 32. Paint the surface area-one coat 18.00 SF 0.00 0.47 8.46 <br /> Prime new drywall. <br /> 33. Paint the walls-two coats 25.78 SF 0.00 0.69 17.79 <br /> 34. Clean and deodorize carpet-heavy 112.22 SF 0.00 0.59 66.21 <br /> staining <br /> 35. Interior door-Reset- slab only , 1.00 EA 0.00 9.56 9.56 <br /> 1 <br /> Totals: Bedroom 531.50 <br /> 2' 5" Closets Height:8" <br /> 12.50 SF Walls 18.24 SF Ceiling <br /> tet- (NCloset °p <br /> N 30.74 SF Walls&Ceiling 18.24 SF Floor <br /> 3' 7" 5' H 2.03 SY Flooring 18.75 LF Floor Perimeter <br /> Bath 21.17 LF Ceil.Perimeter <br /> Door 2'5"X 7' Opens into BEDROOM <br /> i <br /> DESCRIPTION QNTY REMOVE REPLACE TOTAL <br /> 36. Content Manipulation charge-per hour 0.25 HR 0.00 39.12 9.78 <br /> 37. Batt insulation-4"-R11-unfaced batt 6.00 SF 0.00 0.45 2.70 <br /> 38. Polyethylene vapor barrier 6.00 SF 0.00 0.24 1.44 <br /> 39. Drywall replacement per LF-up to 2' 3.00 LF 0.00 5.14 15.42 <br /> tall <br /> 40. Paint the surface area-one coat 6.00 SF 0.00 0.47 2.82 <br /> Prime new drywall. j <br /> 41. Paint the walls-two coats j 12.50 SF 0.00 0.69 8.63 <br /> 42. Stain&finish baseboard 13.75 LF 0.00 1.07 14.71 <br /> 43. Baseboard-3 1/4" stain grade 1 13.75 LF 0.00 3.31 45.51 <br /> 44. Carpet pad 18.24 SF 0.00 0.59 10.76 <br /> 45. Lay existing carpet-Labor only 18.24 SF 0.00 0.51 9.30 <br /> 46. Mask and prep for paint-plastic,paper, 21.17 LF 0.00 0.92 19.48 <br /> tape(per LF) <br /> 47. (Install)Bifold door-Colonist Single 1.00 EA 0.00 39.18 39.18 <br /> Totals: Closet 179.73 <br /> RYERSE_MIMI RC 14/30/2013 Page:4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.