My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info including 2015 design
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0225 Old Crystal Bay Road South - 04-117-23-24-0002
>
Septic
>
septic info including 2015 design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:11:51 PM
Creation date
3/21/2018 11:52:40 AM
Metadata
Fields
Template:
x Address Old
Address
0225 Old Crystal Bay Rd S
Document Type
Septic
PIN
0411723240002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> ° , <br /> ei: 0 <br /> -vi.:.,,t.,. CITY of ORONO <br /> ,�ti Municipal Offices <br /> 14:,...........)1311T-4. 7.11 ,;; ". G Street Address: Mailing Addre <br /> EgHO¢� 2750 Kelley Parkway P.O. 66u: <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> Owner: Nor Mqn Hc\ Address: S O l() Cc ys-tq( 861y 0 S . <br /> City Ordinance 199 requires that each existing on-Site sewage treatment system in Orono be inspected every two years. <br /> The on-site sewage treatment system at the above address has been inspected and appears to fall into the categories checked below. <br /> SYSTEM CONFORMITY (1-3): <br /> c"CODE SYSTEM" An ISTS which meets all the location,design and construction standards of the current Orono Municipal Code. <br /> "COMPLIANT SYSTEM" An ISTS which does not meet all the location,design and construction standards of the cunent Orono Municipal <br /> Code but does meet the three foot separation requirement,and which is not failing or an imminent threat to public health or safety. <br /> 3 "NON-COMPLIANT SYSTEM" A prohibited ISTS;an ISTS located within a designated 100-year flood plain,any ISTS which may <br /> or may not meet all the location,design,or construction standards of the current Orono Municipal Code and which is failing for any reason;and <br /> any ISTS with less than three feet of unsaturated soil or sand between the distribution device and the limiting soil characteristics. <br /> TANK CONDITION(5-10): G <br /> Tank inspection indicates: • <br /> 5 Pumpout not needed at this time. <br /> 6) Tank must be pumped out this year (city code requires tanks to be pumped out every 3 years. Tank was last pumped 9—CC <br /> —ci 9 ). <br /> 7 Solids accumulation in tanks is at a critical a critical 1�veL Tanks should be pumped out as soon as possible. <br /> 8 System is discharging to the surface. Tanks must be umped out within 48 hours to eliminate surface discharge. <br /> 9 Inspection risers missing-tanks could not be insp Inspection risers(4"dia.pipe)must be installed in each tank at next pumpout If tanks <br /> have not been pumped out within the last three years, ey should be pumped out now. <br /> 10 Inspection pipe is located directly over tank baffle(d es not give accurate measurement of solids accumulation). If tanks have not been pumped <br /> out within the last three years,they should be pumped out now. <br /> DRAINFIELD CONDITION(11-14): "l <br /> 11 Drainfield is dry,no surfacing evident. <br /> 12 Some evidence of surfacing,not critical yet <br /> • <br /> 13 Drainfield is saturated and visibly discharging untreate effluent to the surface. Contact the City Inspector immediately.Repairs"must be <br /> completed within 90 days. <br /> 14 Drainfield extent and condition unknown. • <br /> COMMENTS: S`( .1-• e.-�. • o OV O I� _S <br /> �r P �.P ��K s - <br /> (6 =30 -0 \ 6\t‘f, A.„,k,,,,,„„.,,_ <br /> Date of Inspection Septic S .:ystem ystem Inspector <br /> Note: In the event that this inspection re$rt is used to satisfy the requirements for a mortgage or other transfer of property,be advised that this report does not guarantee <br /> or certify that an existing system will continue to function properly,but is merely an opinion of the adequacy of the system under current conditions based on the available <br /> information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.