Laserfiche WebLink
Date: 5/15/2007 Revision Date: 5/15/2007 New Construction <br /> Site Information <br /> Address 1: Project#: Miller <br /> Address 2: Lot: Block: <br /> City: County: Subdivision: <br /> Application Information <br /> Business Name: Palo Companies, Inc MN Contractor License #:5693PM <br /> Contact Person: Ed Lehto <br /> Office Ph: 320-286-6133 Fax: 320-286-3230 Cell Ph: <br /> Address 1: 14208 US Hwy 12 SW <br /> City: Cokato State: MN Zip Code: 55321 <br /> House Details <br /> Square Feet: 6000 sq. ft. Avg. Ceiling Ht: 9 ft. Number of Bedrooms: 5 <br /> Ventilation : Balanced <br /> Total Ventilation Capacity : 236 cfm. <br /> Minimum Continuous Ventilation :90cfm. <br /> Intermittent Ventilation: 146 cfm. <br /> Combustion Appliance <br /> Water Heater: NA <br /> Furnace/Boiler 1: Direct Vent/Sealed Combustion Input BTUs: 100,000 Independently Vented <br /> Furnace/Boiler 2: Direct Vent/Sealed Combustion Input BTUs: 100,000 Independently Vented <br /> Other Combustion Appliances <br /> Gas Fired Direct Vent Fireplace(s): No Gas Fired Power Vent Fireplace(s): No <br /> Gas Fired Natural Draft Fireplace(s): No Solid Fuel Appliance(s): One <br /> Exhaust Equipment <br /> Continuous Exhaust Ventilation Capacity (cfm): NA Clothes Dryer (cfm): 135 <br /> Exhaust Fan Rating (cfm): 75 Next Exhaust Fan Rating(cfm): 100 <br /> Make-Up Air <br /> Total Make-Up Air Required (cfm): 5 <br /> Passive Make-Up, Round Rigid: 3 inches or Insulated Flex: 4 inches <br /> Combustion Air <br /> Minimum Combustion Air Requirements Have Been Met. <br /> Applicant Name (print): 13 1£1-7"." Signature/Date: i <br /> Code Official (print): Signature/Date: <br /> ©2004 CenterPoint Energy Minnegasco. 2004 Mechanical Code Guidelines. Page 1 <br />