My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-P10146 - septic
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0085 Old Crystal Bay Road South - 04-117-23-21-0004
>
Septic
>
2006-P10146 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:11:25 PM
Creation date
3/21/2018 10:54:25 AM
Metadata
Fields
Template:
x Address Old
Address
0085 Old Crystal Bay Rd S
Document Type
Septic
PIN
0411723210004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' y <br /> Rusty Olson's--Soil and Percolation Testing <br /> Joseph J. Olson--MPCA License#810 <br /> 11481 Riverview Rd. NE,Hanover,MN 55341 <br /> (763) 498-8779 Fax(763) 498-8290 <br /> Pager(952) 980-8846 Digital <br /> September 11,2005 <br /> Scott Miller <br /> 85 S.Old Crystal Bay Road <br /> Orono,Hennepin County <br /> This on-site Sewage Treatment System is designed for a Type I,five-bedroom home in accordance with the Minnesota <br /> Pollution Control Agency Chapter 7080 and local ordinances. <br /> The seasonally saturated zone is present at 16"-22"(mottled soil). Due to seasonally saturated soils,a pressurized <br /> Mound System will need to be installed to treat septic effluent. The bottom of the treatment area must be located at <br /> least 3'above the saturated soils. <br /> All neighboring wells are greater than 100 feet from proposed treatment areas. <br /> The soils at a depth of 12"have a percolation rate averaging 7 MPI. <br /> The future site has duel rock beds.The rock beds meet the absorption area requirements. <br /> A pumping chamber will need to be installed to lift the effluent to the treatment area. The power supply and <br /> switches must be located outside the manhole and pumping chamber in a weatherproof enclosure. A <br /> warning device must be installed with light and sound devices;this is in case of a pump failure. <br /> Septic system should be fenced off 20' away from proposed and future systems before construction begins. <br /> Keep all heavy equipment off of the proposed treatment areas before,during and after construction. The area <br /> around both sites must be fenced off by the contractor before any construction begins. This Design is not valid <br /> and the System will need to be relocated if failure to protect the areas proposed for On-Site Sewage Treatment <br /> occurs. <br /> Nothing other than gray water,(laundry,showers,etc.) Human water and toilet tissue should be disposed of into the <br /> septic tanks. Garbage disposals are not recommended. Additives must not be used;they may cause harmful damage to <br /> your septic system. It is recommended that you pump the tank every year for I tank every two years for two tanks. <br /> Sincerely, <br /> CITY OF ORONO Joseph J.Olson <br /> EPEC M&C Fes' <br /> '- <br /> DATE' D PERMIT <br /> APPROVEAl*VI3MITt'F.D <br /> APPROVED WITH CORRECTIONS AS NOTb <br /> win APPROVED•CORRECTA RESUBMIT <br /> cic soonest*ars for your informatics. Ail work*ball is dpi <br /> M Rd awttpliat+ca with all applicable sods and swiss coda. <br /> $equlrements ineladitt$heart not specifically aotod M/1itYt*?Wlt <br /> 1W THIS K•AN SEIM IIITs AT ALL TIMES <br />
The URL can be used to link to this page
Your browser does not support the video tag.