My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
violation info
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0085 Old Crystal Bay Road South - 04-117-23-21-0004
>
Correspondence
>
violation info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:11:28 PM
Creation date
3/21/2018 9:42:57 AM
Metadata
Fields
Template:
x Address Old
Address
0085 Old Crystal Bay Rd S
Document Type
Correspondence
PIN
0411723210004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINNEHAHA CREEK010 <br /> WATERSHED DISTRICT <br /> QUALITY OF WATER QUALITY OF LIFE <br /> DATE: December 6, 2010 <br /> TO: Scott Miller <br /> The Minnehaha Creek <br /> FROM: Catherine Bach, Minnehaha Creek Watershed District <br /> Watershed District is <br /> committed to a RE: MCWD Permit Needed: 85 Old Crystal Bay Road, Orono <br /> leadership role in <br /> Dear Mr. Miller, <br /> protecting, improving <br /> and managing the During our meeting on your property on November 2, 2010 regarding your <br /> proposal to realign the driveway,the stockpiling of over 50 cubic yards of soil was <br /> surface waters and observed. Any activity that disturbs an area> 5,000 square feet or involves the <br /> affiliated groundwater grading, excavating, filling, or storing on site of 50 cubic yards of soil or more <br /> requires a permit under MCWD's Erosion Control Rule. Please complete the <br /> resources within the following requests: <br /> District, including their <br /> > Submit a completed permit application for the stockpiling of>50 cubic yards <br /> relationships to the of soil by 4:30 PM on Monday,December 13,2010 (application form and <br /> ecosystems of which they application checklist attached) <br /> are an integral part. <br /> ➢ Install temporary soil stabilization as soon as conditions permit. All <br /> We achieve our mission exposed soil areas must be stabilized no later than 14 days after construction <br /> through regulation, activity has temporarily or permanently ceased. <br /> capital projects, > Ensure perimeter control is installed effectively on all downgradient <br /> education, cooperative perimeters at all times (silt fence must be trenched in at least 6"—see <br /> endeavors, and other attached figure) <br /> programs based on Please complete the above mentioned requests by the given deadlines to avoid formal <br /> sound science, enforcement action. Thank you for your immediate attention to this matter. If you <br /> have any questions feel free to contact me at(952) 641-4504 or <br /> innovative thinking, an cbach@minnehahacreek.org. <br /> informed and engaged <br /> Sincerely, <br /> constituency, and the <br /> cost effective use of iAl� <br /> treM140 . <br /> public funds. <br /> Catherine Bach <br /> District Technician <br /> 18202 Minnetonka Boulevard, Deephaven, MN 55391 • 952-471-0590 • Fax:952-471-0682 • www.minnehahacreek.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.