Laserfiche WebLink
INSPECTOR CHECKLIST - mound <br /> I opside Addition <br /> O WELL setbacks: 20'to pressure tested sewer line (5 psi for 15 min) <br /> 50'to everything 100 to dispersal area with shallow well <br /> PROPERTY LINES setback: 10'to everything <br /> Road setback: platted: 10'prop line. Metes&bounds: out of road easement,or outer ditch. <br /> LAKE I BLUFF setback: 20'for bluff. Lakes: GD _, RD_, NE . Protected Protected wetland . <br /> — <br /> Building setbacks: 10'for everything, 20'for dispersal area. <br /> WATER LINE under pressure se 10'to bed,tank&sewer line. (else sewer line' 12"below) <br /> O Sewer line&baffle connection (no 90's, 3'between 45's, slope min 1'in 8', max 2"in 8') <br /> (no depth reqs, clean out every 100', Sch 40 pipe) <br /> ElSeptic tank and risers (water tight, insulated, proper depth,existing verified by pumping) <br /> mfg 2250 gallons none <br /> Riser over outlet, riser over inlet or center, and 6"+ inspection pipe over any remaining baffles. <br /> — <br /> No effluent filter&alarm <br /> Dose tank risers and piping (water tight, insulated,proper depth, drainback) <br /> — <br /> mfn 1300 gallons <br /> 0 dose pump 36 gpm ######head VERIFY PUMP CURVE ##### min ON ###### hr OFF <br /> El float setting drop ##### inches at 25.5 gpi "DESIGNED" ##### inches approx float tether length <br /> ##### gal dose divided by gpi "INSTALLED"= inches float drop(field corrected <br /> LABEL pump requirements and drawdown on riser or panel <br /> J Cam lock reachable from grade-30"max. .1-hook weep hole. Supply line access (no hard 90's) <br /> 2.0 inch supply pipe: Sch40, sloped 1/8"+, supported by 4"sch40 sleeve or compacted, and buried 6"+. <br /> splice box/control panel/electrical connections <br /> flow measurement: CT, ETM, time dosed, home water meter <br /> mound absorption area rough up <br /> mound rock dimensions 10.0 X 63.0 <br /> Sand lift depth 16 inches. (Jar test:2"sand leaves c 1/8"silt after 30 min) <br /> ❑ Absorption Sand beyond rock 0.0 upslope 10.0 downslope <br /> ElBerried topsoil beyond rockbed 11 upslope 12 sideslope 22 downslope <br /> Hcover depth of 12-18"+ VERIFY <br /> 3 laterals (1-2'from edge of rock) <br /> 2.00 inch pipe size (Sch40 pipe&fittings) <br /> 3.0 ft lateral spacing <br /> 7/32 inch perforations <br /> 3.0 ft perforation spacing <br /> Air inlet at end of laterals, and at top feed manifold if necessary. VERIFY <br /> clean outs (no hard 90's) <br /> 4'inspection pipe to bottom of rock,anchored VERIFY <br /> _ Abandon existing system-if necessary I lite-use existing tank certification <br /> monitoring plan and type <br /> welt abandonment form -if necessary <br />