My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-00214 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1629 Bohns Point Road - PID: 17-117-23-11-0005
>
Permits/Inspections
>
2018-00214 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:31:24 PM
Creation date
3/19/2018 3:37:28 PM
Metadata
Fields
Template:
x Address Old
House Number
1629
Street Name
Bohns Point
Street Type
Road
Address
1629 Bohns Point Road
Document Type
Permits/Inspections
PIN
1711723110005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Builder Acknowledgement Form <br /> Permit #2018-00214 / 1629 Bohns Point Road <br /> Builder Representative Name: indr' DT--vk <br /> Permit Conditions: Initials <br /> The City's engineer revised the grading plan to indicate where perimeter erosion control <br /> measures(silt fence, bio logs, etc.) down gradient from the proposed work be installed. <br /> Erosion control mechanisms must be installed and inspected by the City prior to any land <br /> disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to // g. <br /> inspection. <br /> Erosion control shall be installed and maintained throughout the entire project and must ,C///nj <br /> remain until vegetation has been established. _ <br /> A haul route shall be submitted to the City Engineer for approval and inspection prior to <br /> commencement of hauling from the site.The property owner shall be responsible for cleaning <br /> and repair of roadways for any adverse impacts. <br /> Applicant should coordinate additional driveway connection with the owner of Track G �n� <br /> easement. /4/ <br /> The sewer cleanout should be protected during paving to ensure the resident has continued <br /> access for future maintenance needs. <br /> The hardcover calculations call out an area where plastic was removed and fabric installed to <br /> meet the allowed hardcover of 25%. The as-built survey should call out the area modified for <br /> verification. <br /> Prior to the release of the escrow money an as-built survey and hardcover calculations must be fri/)' <br /> submitted and approved. <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios,grading, sidewalks, retaining <br /> walls, etc. not currently shown on the approved survey will require a separate Zoning Permit J <br /> application to be submitted and approved prior to the work commencing. <br /> Any retaining walls that are over 4-feet in height or tiered walls not separated by twice of the <br /> height of the lower wall require engineered plans and a building permit to be submitted and 02- <br /> approved prior to construction. <br /> w:\street files\bohns pt rd\1629\builder acknowledgement form 2018-00214.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.