Laserfiche WebLink
Fees to be Charged YES NO <br /> Permit I/' <br /> Plan Review }f <br /> State Surcharge U <br /> Investigation Fee <br /> SAC—Number of SAC Units <br /> Other(specify) <br /> Square Footage $ per Square Footage <br /> Basement X = $ <br /> 1st Floor X = $ <br /> 2nd Floor X = $ <br /> Garage X = $ <br /> Estimated Construction Value: $ l oo <br /> Orono Inspections Required Work Requiring Separate Permits <br /> ❑ Footing 0 Site 0 Plumbing 0 Grading/Filling <br /> ❑ Poured Wall 0 Silt Fence/Erosion Control 0 Mechanical 0 Fire <br /> ❑ Foundation Survey 0 Hardcover Removal 0 Fireplace 0 Water Connection <br /> ❑ Framing 0 Other(specify) 0 Masonry 0 Sewer Connection <br /> ❑ Waterproofing/Drain tile 0 Mfg. 0 Lawn Irrigation <br /> ❑ Foundation Waterproofing 0 Other(specify) 0 Landscaping <br /> Framing 0 Septic <br /> `,Insulation <br /> ❑ As-Built Survey <br /> Final <br /> �❑ Lathe Required State Permits <br /> ❑ Other(specify) <br /> 0 Well '(Electrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> • 0 See Builder Acknowledgement Form <br /> 0 Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: June 2017 <br /> z:\forms\plan review checklist 06-2017.docx <br />