My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ground lease/sub lease
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1030 Old Crystal Bay Road North - No PID
>
Misc
>
Ground lease/sub lease
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:50 AM
Creation date
3/15/2018 2:59:28 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM TO GROUND LEASE AND SUBLEASE <br /> THIS ADDENDUM TO GROUND LEASE AND SUBLEASE is made effective as of <br /> , 1994, by and among the Independent School District #278 <br /> ("District"), and City of Orono ("City"), and Orono Baseball Association, ("OBA"). <br /> District and city are parties to that certain Ground Lease (the Ground Sub eaGround Lease") <br /> e( the "Ground <br /> of April 15, 1994, and City and OBA are parties to that certain <br /> Sublease") dated as of April 15, 1994 (all capitalized terms utilized herein shall have the <br /> meanings ascribed to them in the Ground Lease, unless otherwise defined herein). The parties <br /> desire to amend the Ground Lease and the Ground Sublease in order to provide for certain site <br /> work to be conducted bythe OBA in connection with the extension of the driveway shown on <br /> "OBA Approved Plans (the Driveway") to the land adjoining the Leased Premises owned by <br /> the District (such extension of the OBA Driveway being referred to herein as the "Driveway <br /> Extension") and to provide for the maintenance of the Driveway extension. <br /> 1. OBA shall be responsible for site work required to enable the construction of a <br /> driveway along the north edge of the northerly most ball field at proper grade and with proper <br /> slopes. The site work shall include the construction of a retaining wall of approximately 100 <br /> feet in length, grading required for the construction of the retaining wall, and the installation of <br /> a culvert to handle the stormwater drainage that would have been carried by a ditch on the south <br /> side of the driveway but which was eliminated due to the need for a retaining wall. The site <br /> work shall be subject to customary City approvals of plans and specifications. District shall be <br /> responsible for the construction of the actual Driveway Extension. The Driveway Extension <br /> shall extend from the northern end of the parking lot shown on the Approved Plans and shall <br /> travel around the north edge of the northern most ball field, between said field and County Road <br /> 6. OBA and District acknowledge that City is not responsible for any costs associated with the <br /> Site Work or the construction of the Driveway Disa t rvewaylhave ext extension, <br /> tnhe <br /> right of ingress and egress and from the OBA driveway, <br /> retaining wall, and drainage culvert. <br /> 2. The Site Work shall be conducted at such time as OBA in its discretion <br /> commences such construction or at such earlier date as District notified OBA in writing prior <br /> to January 1 of any year that the Driveway <br /> Extension <br /> required, <br /> n which case BA the date <br /> l cause <br /> the construction of the site work to be c p prior to June 30, of the year following <br /> notice is received. <br /> 3. OBA shall maintain the OBA driveway at all times, except that the District shall <br /> be responsible for snow plowing to enable use of the driveway after the regular baseball season <br /> and for any additional maintenance required by reason of the District's use of the OBA <br /> driveway, if any. After initial construction of the Site <br /> Work and the Driveway Extension, <br /> District shall at all times provide maintenance <br /> e. <br /> 4. The Site Work and the Driveway Extension shall be permanent and need not be <br /> removed at the expiration of the Lease Term. • <br />
The URL can be used to link to this page
Your browser does not support the video tag.