Laserfiche WebLink
ADDENDUM TO GROUND LEASE AND SUBLEASE <br /> THIS ADDENDUM TO GROUND LEASE AND SUBLEASE is made effective as of <br /> , 1994, by and among the Independent School District #278 <br /> ("District"), and City of Orono ("City"), and Orono Baseball Association, ("OBA"). <br /> District and city are parties to that certain Ground Lease (the Ground Sub eaGround Lease") <br /> e( the "Ground <br /> of April 15, 1994, and City and OBA are parties to that certain <br /> Sublease") dated as of April 15, 1994 (all capitalized terms utilized herein shall have the <br /> meanings ascribed to them in the Ground Lease, unless otherwise defined herein). The parties <br /> desire to amend the Ground Lease and the Ground Sublease in order to provide for certain site <br /> work to be conducted bythe OBA in connection with the extension of the driveway shown on <br /> "OBA Approved Plans (the Driveway") to the land adjoining the Leased Premises owned by <br /> the District (such extension of the OBA Driveway being referred to herein as the "Driveway <br /> Extension") and to provide for the maintenance of the Driveway extension. <br /> 1. OBA shall be responsible for site work required to enable the construction of a <br /> driveway along the north edge of the northerly most ball field at proper grade and with proper <br /> slopes. The site work shall include the construction of a retaining wall of approximately 100 <br /> feet in length, grading required for the construction of the retaining wall, and the installation of <br /> a culvert to handle the stormwater drainage that would have been carried by a ditch on the south <br /> side of the driveway but which was eliminated due to the need for a retaining wall. The site <br /> work shall be subject to customary City approvals of plans and specifications. District shall be <br /> responsible for the construction of the actual Driveway Extension. The Driveway Extension <br /> shall extend from the northern end of the parking lot shown on the Approved Plans and shall <br /> travel around the north edge of the northern most ball field, between said field and County Road <br /> 6. OBA and District acknowledge that City is not responsible for any costs associated with the <br /> Site Work or the construction of the Driveway Disa t rvewaylhave ext extension, <br /> tnhe <br /> right of ingress and egress and from the OBA driveway, <br /> retaining wall, and drainage culvert. <br /> 2. The Site Work shall be conducted at such time as OBA in its discretion <br /> commences such construction or at such earlier date as District notified OBA in writing prior <br /> to January 1 of any year that the Driveway <br /> Extension <br /> required, <br /> n which case BA the date <br /> l cause <br /> the construction of the site work to be c p prior to June 30, of the year following <br /> notice is received. <br /> 3. OBA shall maintain the OBA driveway at all times, except that the District shall <br /> be responsible for snow plowing to enable use of the driveway after the regular baseball season <br /> and for any additional maintenance required by reason of the District's use of the OBA <br /> driveway, if any. After initial construction of the Site <br /> Work and the Driveway Extension, <br /> District shall at all times provide maintenance <br /> e. <br /> 4. The Site Work and the Driveway Extension shall be permanent and need not be <br /> removed at the expiration of the Lease Term. • <br />