Laserfiche WebLink
7. Occupa t Load Signage <br /> The archite t is to notify the owner that they are to provide maximum occupant load signage in <br /> meeting ro m and arena spaces upon substantial completion of the building. Maximum occupant <br /> load numb: s are to be coordinated with the City of Orono. This signage should document the <br /> occupancy imitations based on the total plumbing fixture count. <br /> $. Plumb'I Issues <br /> "RPZ" sho in plumbing plans is not allowed by City of Orono.This information is being <br /> forwarded the mechanical engineer at HGA. <br /> 9. Cross-A sle Width <br /> UBC requi -s 54" clear width at cross-aisles in bleacher seating areas. The building plans meet <br /> this require .ent at both upper and lower cross aisles_The 54" at the lower cross-aisle is mea- <br /> sured from he edge of the first bleacher row to the dasher board assembly.The 54" at the upper <br /> cross-aisle s measured from the edge of the top recessed stair riser to the west arena wall_ <br /> This shouI address all outstanding code issues which I have noted during the review process. <br /> Please do it hesitate to call me if you have any questions. <br /> Since ly, <br /> eel <br /> Victor Pec aty,AIA <br /> Ted Rozeb. om Architects <br /> vi uTi J4C1033ZOH cI3,L 08L5 TLfi �T9 XF3 £fi:fT 96/VZ/ZT <br />