Laserfiche WebLink
Code Review <br /> Orono Ice Arena <br /> April 15, 1996 <br /> Page 2 <br /> Type of Construction <br /> [Chapter 6 and Table No. 6-A] <br /> Proposed construction Type: II One hour for all areas <br /> Location on Property <br /> [Section 503 and 602-606 and Table No.5-A] <br /> Distances to adjoining property lines <br /> East: 189'-0" <br /> West: 50'-0" <br /> North: 50'-0" <br /> South: 177'-0" <br /> Allowable Floor Area <br /> [Table 5-B and Section 505] <br /> Group A2.1, Type II One Hour,Allowable two story building area: 13,500 sq. ft. <br /> Increase 100%for separation on all sides: 13,500 sq. ft. <br /> Increase 100% for fully sprinldered: 13,500 sq. ft. <br /> Total allowable area 40,500 sq. ft. <br /> Building Height <br /> [Table 5-B and Section 209 and 220] <br /> Allowable Building Height: 2 Story for Type A2.1 (II One Hour) <br /> Fire Resistive Requirements <br /> [Chapter 6 and Table No. 6-A and Occupancy requirements] <br /> Proposed Construction Type: II N <br /> 1. Exterior Bearing Walls: 1 Hour <br /> 2. Interior Bearing Walls: 1 Hour <br /> 3. Exterior Non-bearing Walls: 1 Hour <br /> 4. Structural Frame: 1 Hour <br /> 5. Permanent Partitions: 1 Hour <br /> 6. Shaft Enclosures: 1 Hour <br /> 7. Floor/Ceiling Construction: 1 Hour <br /> 8. Roof/Ceiling construction: 1 Hour <br /> 9. Exterior Doors and Windows: Protected less Than 10 Feet from Property Line <br /> [Section 6033.2] Not permitted less Than 5 Feet from Property Line <br /> 10. Stairway Construction: Shall be noncombustible construction <br />