Laserfiche WebLink
b. Grading and surfacing plan - dated March 22, 1996. <br /> c. Planting plan- dated March 21, 1996, most revised date <br /> d. Floor plan - dated March 22, 1996, most revised date <br /> e. Exterior elevations - dated March 22, 1996, most revised date <br /> f. Site plan - dated March 22, 1996, most revised date <br /> 2. Upon application for a building permit, applicant must provide the following <br /> information: <br /> a. All plans as noted above must be signed by either the licensed architect or <br /> licensed engineer. <br /> b. Final specs and plans for extension of the utilities for the City Engineer's <br /> review. <br /> c. Written report from applicant's architect confirming number of SAC units <br /> required by Met Council. <br /> d. Final grading and paving plans to reflect Orono Engineer's <br /> recommendations and corrections. <br /> e. Payment of required SAC units. Payment of sewer and water connection <br /> fee at $8490.00 per unit to the City. Total payment to be based on number <br /> of SAC units charged by Met Council. <br /> 3. Applicant and owner to grant drainage easement over detention pond on property <br /> (see sample enclosed). <br /> 4. Applicant to obtain an access permit for the new curb cut at Old Crystal Bay Road <br /> North from the Orono Public Works Department. <br /> Page 5 of 9 <br />