My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Gate frames shall be 1.90" O.D. schedule 40 pipe welded at each corner.Braces and <br /> trusses shall be furnished when necessary. <br /> F. Gate fabric to be the same as specified for the fence. <br /> G. Post braces shall be used at each gate,corner,pull and end posts. Post brace shall consist <br /> of a round tubular brace extending to each adjacent line post at mid-height of fabric,and a <br /> truss consisting of a rod not less than 3/8" diameter from the line post back to gate,corner, <br /> pull or end posts,with a turnbuckle for adjustment. <br /> H. Post tops(ornamental tops)shall be fitted over outside of posts to exclude moisture from <br /> tubular posts. <br /> I. Stretcher bars shall be made of steel bars 3/16"x 3/4",2" shorter than full height of fabric. <br /> Provide where attaching fabric to all terminal posts,threaded through fabric. Stretcher <br /> bars shall be provided for each gate,end post and two at each corner and pull post. <br /> J. Coil spring galvanized steel tension wire shall be 6 gauge diameter stretched along the <br /> bottom of the fence and fastened with 9 gauge diameter galvanized steel hog rings at <br /> intervals of 2 feet unless bottom rail is shown in fence detail on plans. <br /> K. All dimensions and gauges of material are subject to accepted industry tolerance <br /> standards. Any required field touch-up will be in compliance with manufacturer's <br /> instructions. Jobsite shall be cleared of excess spoilage of concrete, cut wires,etc.,and <br /> post hole excavation shall be disposed of off the limits of the site. <br /> L. Upon request of the owner or authorized representative, samples of each component shall <br /> be submitted for approval prior to fabrication and shipment of fencing for this project. <br /> Mill certificates shall confirm compliance with these specifications and fabrication from <br /> domestic produced steel. <br /> M. Any material found not to be in compliance with this specification shall be removed and <br /> replaced at contractors expense. <br /> PART 3 EXECUTION <br /> 3.1 POST SETTINGS <br /> A. Line and terminal posts to be of sufficient length to allow for approximately 36" settings <br /> into concrete footings. Footing diameter to be 10" for line posts and 12" for corner and <br /> terminal posts. Line post spacings not to exceed 10'-0" o.c. Concrete footings shall meet <br /> requirements for 3,000 psi exterior concrete, Section 03300. <br /> ADDENDUM#1 <br /> 1607.001 -ORONO ICE ARENA(CP-2) Page 02830-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.