Laserfiche WebLink
D. Field test reports indicating and interpreting test results for compliance with performance <br /> requirements specified in Part 3 of this Section. <br /> E. Maintenance data for hydronic specialties and special-duty valves to include in the <br /> operation and maintenance manual specified in Division 1 and Division 15 Section "Basic <br /> Mechanical Requirements." <br /> 1.5 QUALITY ASSURANCE <br /> A. ASME Compliance: Comply with the following provisions: <br /> 1. ASME B31.9,"Building Services Piping," for materials,products,and installation. <br /> Safety valves and pressure vessels shall bear the appropriate ASME label. <br /> 2. ASME B31.1, "Power Piping," for materials,products,and installation. Safety <br /> valves and pressure vessels shall bear the appropriate ASME label. <br /> 3. Fabricate and stamp air separators and compression tanks to comply with ASME <br /> Boiler and Pressure Vessel Code, Section VIII,Division 1. <br /> 4. Welding Standards: Qualify welding processes and operators according to ASME <br /> Boiler and Pressure Vessel Code, Section IX, "Welding and Brazing Qualifications." <br /> 5. State Building Code with local amendments. <br /> 1.6 COORDINATION <br /> A. Coordinate layout and installation of piping with equipment and with other installations. <br /> B. Coordinate pipe fitting pressure classes with products specified in related Sections. <br /> C. Coordinate installation of pipe sleeves for penetrations in exterior and foundation walls, <br /> floor assemblies,and fire and smoke bathers. Coordinate with requirements specified in <br /> Division 7 Sections for sealing and firestopping pipe penetrations. <br /> 1.7 EXTRA MATERIALS <br /> A. Maintenance Stock: Furnish a sufficient quantity of chemicals for initial system startup <br /> and for preventive maintenance for one year from Substantial Completion. <br /> PART 2-PRODUCTS <br /> 2.1 MANUFACTURERS <br /> A. Manufacturers: Subject to compliance with requirements,provide products by one of the <br /> following: <br /> ADDENDUM#2 <br /> 1607.001 -ORONO ICE ARENA(CP-2) Page 15510-2 <br />