My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.5 PIPE APPLICATIONS <br /> A. General: Flanges,unions,transition and special fittings,and valves with pressure ratings <br /> same or higher than system pressure rating may be used in applications below,except <br /> where specified otherwise. <br /> B. Low-Pressure Natural Gas Systems,above Ground within Building: Use the following: <br /> 1. 2 Inches and Smaller: Steel pipe,malleable-iron,threaded fittings,and threaded <br /> joints. <br /> 2. 2-1t2 Inches and Larger: Steel pipe,butt-welding fittings,and welded joints. <br /> C. Natural Gas Systems,Buried within Building: Use steel pipe,butt-welding fittings,and <br /> welded joints. Encase gas carrier piping in containment conduits. <br /> D. Underground Containment Conduits: Use steel pipe,butt-welding fittings,and welded <br /> joints. <br /> 3.6 VALVE APPLICATIONS <br /> A. Use gas valves for shutoff to appliances. <br /> B. Use gas valves of sizes indicated for gas service piping,meters,mains,and where <br /> indicated. <br /> 3.7 JOINT CONSTRUCTION <br /> A. Use materials suitable for natural gas service. <br /> 1. Brazed Joints: Make joints with brazing alloy having melting point greater than 1000 <br /> deg F(538 deg C). Brazing alloys containing phosphorus are prohibited. <br /> 3.8 PIPING INSTALLATIONS <br /> A. Concealed Locations: Except as specified below,install concealed gas piping in an <br /> air-tight vented conduit constructed of Schedule 40 seamless black steel with welded <br /> joints. <br /> 1. Above-Ceiling Locations: Gas piping may be installed in accessible above-ceiling <br /> spaces (subject to approval of the authority having jurisdiction),when such spaces <br /> are not used as a plenum. Do not locate valves in such spaces. <br /> 2. In Partitions: Do not install concealed piping in solid partitions. Protect tubing <br /> against physical damage when it is installed inside partitions or hollow walls. This <br /> does not apply to tubing passing through partitions or walls. <br /> ADDENDUM#2 <br /> 1607.001 -ORONO ICE ARENA(CP-2) Page 15488 -9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.