My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Structural Configuration: <br /> a. Submittals: Verify mill test reports and other submitted documentation, for <br /> compliance with contract documents. (Structural I) <br /> b. Materials: Verify materials delivered to site comply with contract documents and <br /> approved shop drawings(Technical I): <br /> Bolts <br /> Electrodes <br /> Mechanical Fasteners <br /> Deck Gauge <br /> • <br /> 4. Conventional Testing and Inspection Requirements: <br /> a. High Strength Bolting: <br /> 1) Bolt Material Test: Test a minimum of two bolts of each ASTM class <br /> specified, for bolt hardness and tensile properties. (SNT-TC-1A) <br /> 2) Fabrication and Erection Tolerances: Verify in-place structure satisfies <br /> specified tolerances. (Contractor) <br /> 5. If special inspection of fabricators work is required, testing agent may test and inspect <br /> structural steel at plant before shipment. Owner and SER reserve right to reject <br /> material not complying with Contract Documents at any time before final acceptance. <br /> 6. Definitions: <br /> a. A.S.N.T. -The American Society for Non-destructive Testing. <br /> b. N.D.E. -Non-destructive Evaluation. <br /> c. A.W.S./C.A.W.I. -American Welding Society/Certified Associate Weld <br /> Inspector. <br /> d. A.W.S./C.W.I. -American Welding Society/Certified Weld Inspector. <br /> D. The parties involved shall complete and sign the Special Structural Testing and Inspection <br /> Schedule. The completed schedule is an element of the construction documents and after <br /> permit issuance, becomes part of the building department approved plans and <br /> specifications. The completed schedule shall include the following: <br /> 1. A specific listing of the items requiring inspection and testing. <br /> ADDENDUM#1 <br /> 1607.001 - ORONO ICE ARENA(CP-2) Page 01410 - 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.