Laserfiche WebLink
BRR <br /> NO <br /> GIES <br /> BRR Technologies Dehumidification Schedule <br /> Project: GZ1144,long Lake,MN / Orono Ice Arena Revision Date: 8/22/2006 <br /> Pump Data <br /> 460/3/60 Flow Feet <br /> Description Qty. Fluid Size Amps GPM Head Supplied By Installed By <br /> Cold Coil Pump 1 35%Ethylene Glycol 5 HP estimated 150 80 ft.hd. Rink-Tec Rink-Tec <br /> Suction&Discharge Gages 2 35%Ethylene Glycol 2"to 4"dial Rink-Tec Rink-Tec <br /> Pump Notes:Mount cold coil pump intake pipes on supply side of rink floor pump. Mount return side of cold coils 12"to 20"down stream of the intake pipes that feed the cold coil pump. <br /> Piping,Valve,and Component Data <br /> 120/1/60 Flow Pressure <br /> Description Qty. Fluid Size Amps Drop Supplied By Installed By <br /> Sporlan Solenoid Valve with Coil 2 R22 ME42 x 2 1/8" 0.2 600 mbh 4 psig BRR Technologies Rink-Tec _ <br /> Parker A82BL with Coil 2 R22 2 5/8"Conn x 2"port 0.2 35 tons 5 psig BRR Technologies Rink-Tec <br /> Hot Gas Check Valve 4 R22 2"port,or larger N/A 600 mbh 1 psig Rink-Tec Rink-Tec <br /> Triple Duty Valves to be <br /> mounted on each pump <br /> discharge. <br /> Bell&Gosset Size to pump <br /> Triple Duty Valve 2 35%EG connections. <br /> 150 gpm 4 ft.hd. Rink-Tec Rink-Tec <br /> All shut off valves All Rink-Tec Rink-Tec <br /> All Piping&Insulation All 1"thick on cold piping Rink-Tec Rink-Tec <br /> All Fluids All R22 and 35%EG Fluids need to be added to system Rink-Tec Rink-Tec <br /> All conensation Drains All All traps to be built down 6",then up 2",for a 4"stem height.Trap All drain Connectioi Rink-Tec Rink-Tec <br /> Note: All piping that is inside the arena is to be inulated and is to have White PVC cover jackets over the insulation. Rink-Tec Rink-Tec <br /> Subcooler Data <br /> 120/1/60 Pressure <br /> Description Qty. Fluid Size Amps Drop Supplied By Installed By <br /> Sporlan 3 Way Solenoid Valve <br /> &Coil 2 R22 16D17C-2"Port 2 psig BRR Technologies Rink-Tec _ <br /> 3 Way Solenoid Valve 2 Hot Gas Pilot Line Suction Pilot Line 2 psig Rink-Tec Rink-Tec <br /> 3 Way Solenoid Valve 2 Wiring _ Solenoid Coil Wiring 0.5 2 psig Rink-Tec Rink-Tec <br /> Air Handler Data <br /> • <br /> Air Flow Motor MCA MOPD . <br /> Description SCFM Location Size ESP 460/3/60 460/3/60 Supplied By Installed By <br /> DHU#1 Heatcraft AHU 20,000 Indoor 10 HP 1.75"w.g. 16.5 amps 30 BRR Technologies Rink-Tec <br /> DHU#1 Electrical Indoor 10 HP 1.75"w.q. 16.5 amps 30 Rink-Tec Rink-Tec <br /> DHU#1 Rigging _ Indoor Crane Pick Rink-Tec Rink-Tec <br /> DHU#1 Heatcraft AHU Paint Air Handler to Match the building wall paint. Rink-Tec Rink-Tec <br /> Ductwork Data <br /> Description Qty. Manufacturer Model Number Notes Supplied By Installed By <br /> Sheet Metal Ductwork All Supply=36"round,Return=1000 sfp Extreme Heating and Cooling Extreme Heating and Cooling <br /> Duct Sox Special Part# Duct,needs 3"holes every 2 ft.,blowing at an angle toward the ceiling in order to"wash"over the rin Extreme Heating and Cooling Extreme Heating and Cooling <br /> Fabric Dctwork 200 ft @ 36" Duct Sox or approved equal Includes hanging wire Extreme Heating and Cooling Extreme Heating and Cooling <br /> Motorized Damper Outdoor Air Minimum outdoor air=0 scfm Maximum outdoor air=3,500 scfm Extreme Heating and Cooling Extreme Heating and Cooling <br /> Damper Motors 1 Belimo NF24SR-modulating 0/A Damper Motor EMC Controls Extreme Heating and Cooling <br /> Manual Balancing Dampers 4 One on each Supply and One on each Return Rink A and Rink B Extreme Heating and Cooling Extreme Heating and Cooling <br /> ElectricaL Data <br /> Control Power <br /> Description Qty. Voltage Voltage Supplied By Installed By <br /> Solenoid Power Wiring 6 120/1/60 N/A Rink-Tec Rink-Tec <br /> Pump Power Wiring 1 120/1/60 480/3/60 Rink-Tec Rink-Tec <br /> All other power wiring 120/1/60 N/A Rink-Tec Rink-Tec <br /> Controller Data <br /> Input Inputs Output <br /> Description Qty. %RH Temp. Supplied By Installed By <br /> Electronic Controller 1 %RH Valves and pumps yes yes EMC Controls EMC Controls <br /> 1 CO2 Motorized Damper by Mech Contractor, EMC Controls EMC Controls <br /> Multiple temperature Valves and pumps EMC Controls EMC Controls <br /> Note:Cold Coil Sensors The Cold Coil Sensors MUST be mounted in the coil fins,2"up from the bottom of the coil. EMC Controls EMC Controls <br /> Other Features 1 Modem Interface EMC Controls EMC Controls <br /> Sensor Wiring <br /> Rink-Tec Rink-Tec <br /> Control wiring Rink-Tec Rink-Tec <br /> Start-up support 3 to 4 days Start-up support Rink-Tec,with asistance from BRR Rink-Tec <br /> Analog Phone Line 1 Dedicated to Dehumidifier Controls Owner to provide phone line <br /> Notes: <br /> The discharge line must have an inverted trap,or a check valve before the HR coil. <br /> The discharge check valve should be mounted on a horizontal run to avoid stacking liquid above the check vale. <br /> The heat reclaim coil will condense hot gas into liquid. The piping design must account for that. <br />