Laserfiche WebLink
1301 L'Orient Street <br /> Sir. De. N M St.Paul,Minnesota 55117 <br /> AUTOMATIC SPRINKLER CO. (651)558-3300 • (800)229-6263 <br /> Setting-The Standard... Fax: (651)558-3310 <br /> SHEET 2 of 2-Use separate sheet for each system inspected System No.or Description if multiple <br /> systems 3....L)p 7- <br /> Inspection Report <br /> No. g a 5, <br /> 11 Date dry-pipe valve trip tested(control valve partially open) ,/`A (See Trip Test Table which follows) <br /> 12 Date dry-pipe valve trip tested(control valve fully open) Ai 4- (See Trip Test Table which follows) <br /> 13 Date quick-opening device tested A.)4- (See Trip Test Table which follows) <br /> DRY VALVE TRIP TEST TABLE Q.O.D. <br /> MAKE MODEL SERIAL NO. MAKE MODEL SERIAL NO. <br /> DRY PIPE Time to Trip Water Air Trip Point Time Water Reached Alarm Operated <br /> OPERATING Thru Test-Pipe Pressure Pressure Air Pressure Test Outlet Properly <br /> TEST MIN. SEC. PSI PSI PSI MIN. SEC. YES NO <br /> Without <br /> Q.O.D <br /> With <br /> Q.O.D <br /> 14 Date deluge or preaction valve tested Al A (See Trip Test Table which follows) <br /> TRIP TEST TABLE <br /> Operation ❑PNEUMATIC ❑ELECTRIC ❑HYDRAULIC <br /> Piping Supervised o YES ❑ NO Detecting Media Supervised ❑ YES ❑ NO <br /> DELUGE& Does valve operate from the manual trip and/or remote control stations ❑ YES El NO <br /> PREACTION Is there an accessible facility in each circuit for testing ❑ YES ❑ NO Method of Testing Circuits <br /> VALVES Does each circuit operate Does each circuit Maximum time to <br /> MAKE MODEL supervision loss alarm operate valve release operate release <br /> YES NO YES NO YES NO <br /> 15 See Control Valve Maintenance Table <br /> CONTROL VALVE MAINTENANCE TABLE <br /> Explain <br /> Abnormal <br /> Control Valves Number Type Open Secured Closed Signs Condition <br /> City Control Valves /— 3'- ()j J ,j� a c 17),a c P S <br /> �,}cpass Valves 2- (i " 05i t/ V4/I. :)4 S e 5 <br /> Tank Control Valves <br /> Pump Control Valves <br /> Sectional Control Valves <br /> System Control Valves 120/.. q/' 3 F f l c cti <br /> a � S s5 <br /> Other Control Valves <br /> Kitchen Control Valves <br /> 16 Water Flow Test at Sprinkler Riser <br /> Water Supply Source: dr q t 1 <br /> Tank Pump <br /> Residual <br /> Test Pipe Size of Static (Flow) <br /> Date Location Test Pipe Pressure Pressure <br /> Last Water Flow Test /D-1-09 R1 cQR 5 2" 5 .5- 'S"?This Water Flow Test /0-/ -OA i SPR 5 Z'' 5-5 .S/ <br /> 17 Explain any"No"answers and comments: <br /> 18 Adjustments corrections made during this inspection: -- A I <br /> ©„t (-oat) 3�k Q s� 91JPS-- <br /> --- Eie[t4P Ate4.,,4?5t 4raAmLS/ <br /> 19 Although these comments are not the result of an engineering review,the following desirable improvements are recommended: <br /> Signature: 4s cr•J Date: /6 . /6 . 0C <br /> (Rev.2/8/06) <br />