Laserfiche WebLink
'A it <br /> 1301 L'ORIENT STREET <br /> �. q ` I �' ISI G - y ST.PAUL,MINNESOTA 55117 <br /> 4 Y (651)558-3300• (800)-229-6263 <br /> AUTOMATIC SPRINKLER CO " FAX FAX: (651)558-3310'., <br /> SHEET 2 OF 2 - Use separate sheet for each system inspection , System No. or Description if multiple <br /> 4.,.::::,,,7,..4,,, systems a) c /_' <br /> „ r,' Inspection Report r R 1 <br /> 11. Date dry-pipe valve trip tested (control valve partially open) .. (See Trip Test Table which follows) <br /> � <br /> '` <br /> `- 12. Date dry-pipe valve triptested (control valve fully open) (See Trip Test Table which follows) � .1p ,- <br /> 13. Date quick-opening device tested (See Trip Test Table which follows) <br /> DRY VALVE TRIP TEST TABLE Q.O.D. <br /> ,.s ' MAKE MODEL SERIAL NO. MAKE MODEL SERIAL NO. <br /> , <br /> DRY PIPE Time to Trip Water Air Trip Point Time Water Reached Alarm Operated <br />'4 .,,X ,, OPERATING Thru Test Pipe Pressure pressure Air Pressure Test Outlet Properly <br /> TEST MIN. SEC. PSI PSI PSI MIN. SEC. YES NO <br /> Without c,4i '"' <br /> t <br /> '' • ` <br /> S With <br /> O.O.D. ,g .e.. <br /> s."'E'4 ..' ' '' "mh r * ;..v 3 rv"r - =;: ?k :I '�`;.*:c• '` k,� `f '�-�y, ;._'> ` ' 'SYf_`g'-4 f ` x "'a�8• `,d <br /> ': 14. Date deluge or preaction valve tested - (See Trip Test Table which follows) aF`. <br /> TRIP TEST TABLE a <br /> � ' - Operation ❑ PNEUMAT{6-++r9•'-ELECTRIC ❑ HYDRAULIC A x ' j <br /> ,..,:, Piping Supervised 0 YES 0 NO i Detecting media supervised ❑ YES 0 NO '. --'�'��-' "" �' <br /> '' k DELUGE& Does valve operate from the manual trip and/or remote control stations 0 YES 0 NO <br /> 4 PREACTION Is there an accessible facility in each circuit for testing Method of testing-circuits <br /> VALVES 0 YES 0 NO r <br /> Does each circuit operate Does each circuit Maximum time to +r '�s <br /> - if <br /> MAKE MODEL supervision loss alarm operate valve release operate release ., <br /> YES NO YES NO YES NOk 41 ' <br /> "xe 0t4-4'' �ft <br /> 15. See Control Valve Maintenance Table, <br /> Control Valve Maintenance Table N <br /> "" e <br /> J <br /> , Explain 'i <br /> ai' Abnormal ;>I <br /> Control Valves Number Type Open Secured Closed Signs Condition * v ne <br /> City Connection Control ` ,. <br /> Valve <br /> Tank Control Valves c <br /> Pump Control Valves <br />,.k.:.-,„ Sectional Control Valves r <br /> System Control Valves y' g /� 1 ib,t L U; ,.t`� - <br /> r, Other Control Valves Lv J7/— <br /> Kitchen Control Valve / x <br /> - 16. Water Flow Test at Sprinkler Riser1i .4,1-v,:: .'. 1 <br /> iic Water Supply Source: City Tank 4Pump { <br /> Date Test Pipe Size of Static Residual `„ <br /> h <br /> Location Test Pipe Pressure (Flow) F <br /> �4, Pressure <br /> Last Water Flow Test f .! - " y,'-.-:-5;7_.-- ©A..) <br /> This Water Flow Test <br /> 4-0 <br /> ./�, _ W; w � - ti#b,., � .7 ' <br /> r�- 'kn <br /> 17. Explain any "No" answers and comments: <br />.r <br /> T, , } <br /> 18. Adjustments or corrections� made during this inspection: "^ 'a,),„ 1 .1.._,A-7-..EirAJA(.__F c A'-� :� "L�f f' <br /> '',. .;;;.,i, <br /> �%C�R4s t�t� Sa�� c <br /> Ae.,,,.(24.,c <br /> :, <br /> , : .. <br /> 19. Although these comment.not the result of an engineering review, the following desirable improvements are recommended . <br /> Maus -f A-PC, r 3 Tia/'. f-/�,fi".>S. 4,...1-;—.07-c7— (,^�`/�94. S!.-"Rte. 040, u <br /> tt s p/ :` I i k- a <br /> �,� l, <br /> Signatur . �v,� ' �` -� _ Date / ���/ <br />