My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4269
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 4200 - 4299 (November 23, 1998 - May 24, 1999)
>
Resolution 4269
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 2:01:47 PM
Creation date
3/14/2018 2:01:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, , . . <br /> .,.....----...„ <br /> zlv--- 0 <br /> 4i. <br /> �O O <br /> ._:r ti., <br /> CITY of ORONO <br /> 14 <br /> IA. I �otgi`� '� RESOLUTION OF THE CITY COUNCIL <br /> gES804�' NO. <br /> 11. Applicant shall provide geotechnical recommendations and pavement design prior <br /> to building permit approval. <br /> 12. Applicant shall provide the sanitary final design to be approved by the City Engineer. <br /> All sanitary and storm sewer manholes and catch basins shall have an exterior sealing <br /> sleeve as manufactured by Infi-Shield or approved equal. The sanitary sewer shall <br /> have 18 inches of clearance below the water main at all sanitary sewer/water main <br /> crossings. All sanitary sewer manholes and castings shall be in accordance with City <br /> standards. <br /> 13. Applicant shall provide detailed installation information regarding the water main <br /> crossing to be approved by the City Engineer. All 12-inch valves shall be butterfly <br /> valves and detail included in the plan set. All hydrants shall be 50' minimum from <br /> the exterior walls of the building. <br /> 14. Applicant shall provide a revised storm sewer plan that includes catch basins at all <br /> four access locations. All storm sewer shall be reinforced concrete pipe. The <br /> minimum pipe size for a storm sewer structure with more than 2 leads is 15 inches. <br /> Rip rap shall be provided at all storm sewer inlets and outlets. All flared ends shall <br /> have trash guards. <br /> 15. Applicant shall provide a drainage area map with storm sewer and ponding <br /> calculations. <br /> 16. Applicant shall provide outlet structure details. <br /> 17. Lighting plan, including cut sheets of the lighting poles and fixtures indicating <br /> their color, appearance, height, footcandles, and cutoff angle. <br /> LEGAL DOCUMENTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF <br /> OCCUPANCY <br /> 18. Signed and executed drainage easements shall be provided across all ponding areas <br /> and drainage ways. <br /> Page 8 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.