Laserfiche WebLink
13-10 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS <br /> OPERATION <br /> 0 PNEUMATIC 0 ELECTRIC 0 HYDRAULIC <br /> PIPING SUPERVISED 0 YES O NO i DETECTING MEDIA SUPERVISED <br /> DOES VALVE OPERATE FROM THE MANUAL TRIP ANOrOR REMOTE CONTROL STATIONS 0 YES 0 NO <br /> DELI) & IS THERE AN ACCESSIBLE FACILITY IN EACH CIRCUIT FOR TESTING IF NO,EXPLAIN OYES ONO <br /> PR TON <br /> IVES <br /> 0 YES ONO <br /> DOES EACH CIRCUIT OPERATE DOES EACH CIRCUIT MAXIMUM TIME TO <br /> MAKE MOOEL SUPERVISION LOSS ALARM OPERATE VALVE RELEASE OPERATE RELEASE <br /> YES I NO YES I NO MIN. SEC. <br /> of 150 psi HYfROSTAT1c.,Hydrostatic tests shall be made at not Mss than 200 psi(13.8 bars)for two hours or 50 psi(3.4 bars)above static pressure in excess <br /> ITEST shall n(1 bars)for two hours.Differential dry-pipe valve daggers shall be left open dump test to prevent damage.All aboveground piping leakageDESCRIPTION <br /> PNEJ IMATI:;Establish 40 psl(2.7 bars)air pressure and measure drop which shall not exceed 1-12 psi(0.1 bars)In 24 hours.Test pressure <br /> tanks at normal water level and air pressure and measure air pressure drop which shall not exceed 1-12 psi(0.1 bars)h 24 hours. <br /> ALL PIPING HYDROSTATICALLY TESTED AT ZOO PSI FOR Z HRS. IF NO.STATE REASON <br /> DRY PIPING PNEUMATICALLY TESTED OYES ONO <br /> EQUIPMENT OPERATES PROPERLY 'E YES O NO . <br /> CO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES ANO CORROSIVE CHEMICALS.SODIUM SILICATE OR <br /> DERIVATIVES OF SODIUM( SILICATE.BRINE.OR OTHER CORROSIVE CHEMICALS WERE NOT USED FOR TESTING SYSTEMS OR <br /> • <br /> TESTS STOPPING LEAKS? LYES 0 NO <br /> DRAINI READING OF GAGE LOCATED NEAR WATER ` RESIDUAL PRESSURE WITH VALVE IN TEST <br /> TEST SUPPLY TEST CONNECTION: PSI CONNECTION OPEN WIDE <br /> PSI <br /> UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISERS FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING. <br /> VERIFIED BY COPY OF THE U FORM NO.858 O YES 0 NO OTHER <br /> FLUSHED BY INSTALLER OF UNDER- <br /> GROUND <br /> EXPLAIN <br /> SPRINKLER PIPING 0 YES 0 NO <br /> BLA II <br /> EIS NUMBER USED I LOCATIONS <br /> 111 NUMBER REMOVED <br /> WELDED PIPING 1ii,.YEs 0 NO <br /> IF YES... <br /> • DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY <br /> WITH THE REOUIREMENTS OF AT LEAST AWS D10.9.LEVEL AR-3 <br /> YES ONO <br /> WELDING DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED IN <br /> COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS 010.9.LEVEL AR-3 <br /> .YES ONO <br /> DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A <br /> DOCUMENTED OUALITY CONTROL PROCEDURE TO INSURE THAT ALL DISCS ARE <br /> RETRIEVED.THAT OPENINGS IN PIPING ARE SMOOTH.THAT SLAG ANO OTHER <br /> WELDING RESIDUE ARE REMOVED.AND THAT THE INTERNAL DIAMETERS OF <br /> PIPING ARE NOT PENETRATED <br /> CUTOUTS DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL YES ONO <br /> (DISCS) CUTOUTS(DISCS)ARE RETRIEVED? <br /> HYDRAUUC NAME PLATE PROVIDED '1;.YES ONO <br /> DATA IF NO,EXPLAIN <br /> NAMEPLATE ' 'J/Es O NO <br /> DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN: <br /> REMARKS <br /> NAME OF SPRINKLER C TRACTOR <br /> /71 /4? / //`1E' / OT?j/cdAi <br /> TESTS WITNESSED BY <br /> SIGNATURES FOR E WNER(SIGNED) TITLE../fir of—FICA <br /> DATE <br /> 7Sd%(A/le I • D — ICA It �r1-'31� <br /> `- <br /> ' <br /> FOR INKL CONTRACTOR(SIGNED) TITLE DATE <br /> ADDITIONAL EXPLANATION AND NOTES I I <br /> 85A BACK <br /> Figure 1-10.1(a)(continued) Contractor's Material and Test Certificate for Aboveground Piping. <br /> 1989 Edition <br />