My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
above ground piping info
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Rd N
>
0795 Old Crystal Bay Rd N - 28-118-23-34-0003
>
Misc
>
above ground piping info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:24:41 PM
Creation date
3/14/2018 11:09:40 AM
Metadata
Fields
Template:
Address
House Number
795
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
795 Old Crystal Bay Road North
Document Type
Misc
PIN
2811823340003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13-10 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS <br /> OPERATION <br /> 0 PNEUMATIC 0 ELECTRIC 0 HYDRAULIC <br /> PIPING SUPERVISED 0 YES O NO i DETECTING MEDIA SUPERVISED <br /> DOES VALVE OPERATE FROM THE MANUAL TRIP ANOrOR REMOTE CONTROL STATIONS 0 YES 0 NO <br /> DELI) & IS THERE AN ACCESSIBLE FACILITY IN EACH CIRCUIT FOR TESTING IF NO,EXPLAIN OYES ONO <br /> PR TON <br /> IVES <br /> 0 YES ONO <br /> DOES EACH CIRCUIT OPERATE DOES EACH CIRCUIT MAXIMUM TIME TO <br /> MAKE MOOEL SUPERVISION LOSS ALARM OPERATE VALVE RELEASE OPERATE RELEASE <br /> YES I NO YES I NO MIN. SEC. <br /> of 150 psi HYfROSTAT1c.,Hydrostatic tests shall be made at not Mss than 200 psi(13.8 bars)for two hours or 50 psi(3.4 bars)above static pressure in excess <br /> ITEST shall n(1 bars)for two hours.Differential dry-pipe valve daggers shall be left open dump test to prevent damage.All aboveground piping leakageDESCRIPTION <br /> PNEJ IMATI:;Establish 40 psl(2.7 bars)air pressure and measure drop which shall not exceed 1-12 psi(0.1 bars)In 24 hours.Test pressure <br /> tanks at normal water level and air pressure and measure air pressure drop which shall not exceed 1-12 psi(0.1 bars)h 24 hours. <br /> ALL PIPING HYDROSTATICALLY TESTED AT ZOO PSI FOR Z HRS. IF NO.STATE REASON <br /> DRY PIPING PNEUMATICALLY TESTED OYES ONO <br /> EQUIPMENT OPERATES PROPERLY 'E YES O NO . <br /> CO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES ANO CORROSIVE CHEMICALS.SODIUM SILICATE OR <br /> DERIVATIVES OF SODIUM( SILICATE.BRINE.OR OTHER CORROSIVE CHEMICALS WERE NOT USED FOR TESTING SYSTEMS OR <br /> • <br /> TESTS STOPPING LEAKS? LYES 0 NO <br /> DRAINI READING OF GAGE LOCATED NEAR WATER ` RESIDUAL PRESSURE WITH VALVE IN TEST <br /> TEST SUPPLY TEST CONNECTION: PSI CONNECTION OPEN WIDE <br /> PSI <br /> UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISERS FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING. <br /> VERIFIED BY COPY OF THE U FORM NO.858 O YES 0 NO OTHER <br /> FLUSHED BY INSTALLER OF UNDER- <br /> GROUND <br /> EXPLAIN <br /> SPRINKLER PIPING 0 YES 0 NO <br /> BLA II <br /> EIS NUMBER USED I LOCATIONS <br /> 111 NUMBER REMOVED <br /> WELDED PIPING 1ii,.YEs 0 NO <br /> IF YES... <br /> • DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY <br /> WITH THE REOUIREMENTS OF AT LEAST AWS D10.9.LEVEL AR-3 <br /> YES ONO <br /> WELDING DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED IN <br /> COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS 010.9.LEVEL AR-3 <br /> .YES ONO <br /> DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A <br /> DOCUMENTED OUALITY CONTROL PROCEDURE TO INSURE THAT ALL DISCS ARE <br /> RETRIEVED.THAT OPENINGS IN PIPING ARE SMOOTH.THAT SLAG ANO OTHER <br /> WELDING RESIDUE ARE REMOVED.AND THAT THE INTERNAL DIAMETERS OF <br /> PIPING ARE NOT PENETRATED <br /> CUTOUTS DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL YES ONO <br /> (DISCS) CUTOUTS(DISCS)ARE RETRIEVED? <br /> HYDRAUUC NAME PLATE PROVIDED '1;.YES ONO <br /> DATA IF NO,EXPLAIN <br /> NAMEPLATE ' 'J/Es O NO <br /> DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN: <br /> REMARKS <br /> NAME OF SPRINKLER C TRACTOR <br /> /71 /4? / //`1E' / OT?j/cdAi <br /> TESTS WITNESSED BY <br /> SIGNATURES FOR E WNER(SIGNED) TITLE../fir of—FICA <br /> DATE <br /> 7Sd%(A/le I • D — ICA It �r1-'31� <br /> `- <br /> ' <br /> FOR INKL CONTRACTOR(SIGNED) TITLE DATE <br /> ADDITIONAL EXPLANATION AND NOTES I I <br /> 85A BACK <br /> Figure 1-10.1(a)(continued) Contractor's Material and Test Certificate for Aboveground Piping. <br /> 1989 Edition <br />
The URL can be used to link to this page
Your browser does not support the video tag.