Laserfiche WebLink
Orono Public Schools <br /> IEA Project#201210482 <br /> Orono High School 2012 Bleacher Review June 19,2012 <br /> SITE INFORMATION/OBSERVATIONS—ORONO HIGH SCHOOL <br /> GYMNASIUM (LOVER) <br /> L e <br /> CI <br /> n • e <br /> a o u <br /> •�N,.r� <br /> ISSUES REQUIRED TO BE RESOLVED FOR COMPLIANCE WITH THE MINNESOTA BLEACHER SAFETY ACT <br /> iii040111 <br /> } <br /> Issue 1:Gaps between foot boards and seat boards are greater than Issue 2:With movement of these bleachers,some of the guardrail <br /> 4 inches. The bleachers must be modified to reduce the gaps to less gaps will exceed 4 inches. Extensions need to be added to reduce <br /> than 4 inches. If all of the gaps are less than 9 inches,the bleachers the gap to less than 4 inches <br /> can be certified if a special safety management plan is followed and <br /> an amortization schedule is filed showing when the bleachers will <br /> be .laced. <br /> '' •, <br /> 041, <br /> 111111111111111 <br /> Issue 3:The riser at the top row audience left hinges up,creating a Issue 4:A hole at the top row is larger than 4 inches. <br /> 9-inch gap. This riser should be fastened if the hinge is not required <br /> for retraction. <br /> C IEA,Inc. Page 4 of 21 <br /> INS"I'ITI,TL FCP,EP:\•IRONMMIiNTAL ASSES.SMEN'1,IN(' <br /> vra77r.irninsri(urr.ca P <br />