My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01207 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0795 Old Crystal Bay Road North - 28-118-23-34-0003
>
Permits/Inspections
>
2017-01207 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:24:41 PM
Creation date
3/14/2018 9:59:23 AM
Metadata
Fields
Template:
x Address Old
House Number
795
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
795 Old Crystal Bay Road North
Document Type
Permits/Inspections
PIN
2811823340003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Orono High School Fieldhouse Addition <br /> Engineering Review#1 <br /> Page 2 <br /> 4. The applicant will be required to submit a Maintenance Agreement for all stormwater management <br /> structures and facilities. The agreement should define maintenance responsibilities following <br /> completion of project, specify types and frequencies of inspection and maintenance activities, and <br /> designate who will conduct inspection and maintenance activities. <br /> 5. Record drawings must be submitted upon completion of the project. <br /> 6. If topsoil is to be stripped off disturbed areas and stockpiled on site, stockpile locations should be <br /> indicated on the Sediment and Erosion Control Plans, and siltfence should be indicated around <br /> stockpiles to limit potential for migration of sediment off-site. <br /> 7. A detail for the Concrete Washout Area should be included on the Site Details sheets. <br /> 8. Retaining walls greater than four feet in height are proposed. Walls four feet or greater in height must <br /> be designed by a licensed Professional Engineer. Fences should be indicated for all walls four feet or <br /> greater in height,and details should be included on Site Details as appropriate. <br /> 9. If the North Ball Field is intended to be used for football and soccer,the field should be graded to <br /> recommended field guidelines. The applicant should consider using the traditional crown method to <br /> design slopes for rectangular fields. Revisions to ditch grading and storm sewer may be necessary to <br /> accommodate correct field grading. <br /> 10. Riprap quantities should be indicated on the plans to ensure adequate amount of riprap is provided at <br /> storm sewer outfalls. <br /> 11. Manhole 101 should be replaced with a Pond Outlet Control Structure that conforms to the pond <br /> slope. A detail should be provided on the Site Details sheets. <br /> 12. Perimeter erosion control protection should be provided in all locations down gradient from proposed <br /> disturbed areas. Additional siltfence appears necessary on the west side of the North Ball Field and <br /> around the proposed stormwater pond. <br /> 13. Proposed sediment control logs should be curled upslope on the ends to direct runoff toward the <br /> center of the control measure. <br /> 14. Turf reinforcement mat should be provided on the pond's emergency overflow to limit potential for <br /> erosion during extreme events. <br /> If you have any questions or comments,please contact me to discuss. <br /> Sincerely, <br /> Bolton & Menk, Inc. <br /> ,6ZOte'ig <br /> Robert E.Bean,Jr.,P.E. <br /> Water Resources Engineer <br /> H:\ORNO\C13113299\Orono High School\OronoHS-Review-1-2017-11-21.docx <br /> Bolton&Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.