Laserfiche WebLink
, PLAN REVIEW AZ <br /> FOR NEW STRUCTURES / ADDITIONS <br /> Address: 7 c- A/ 0&'7 /� Ic 'd Permit No.: �` ( v ®lZ©( <br /> Description of work: 1. �a1 )16 /c4 X 0 ( Date Rec'd: /e.-4/1/7 <br /> Septic review by: E%l/(/aes 9L VW/6A Date Approved: <br /> Zoning review by: �. Date Approved: <br /> Building review by: i�i ' / Date Approved: /1 /.' / <br /> , <br /> / L/ , Ur ldr� / ,,H � r_1 <br /> Grading review by: � �✓r`► Date Approved: - 91W7 <br /> Zoning District: Zoning File#: Reso#: Reso Date: <br /> Zoning: Lot Area: SF/AC Width: Lot Coverage: SF <br /> Survey Submitted: D Yes 0 No • Date of Survey: Revised date(?): <br /> Landscape plan submitted? D Yes D No Landscaper: <br /> Proposed Setbacks: <br /> Front(Lake) Rear(Street) ( N S E W ) ( N S E W ) Other Buildings Wetland <br /> Side Side <br /> Defined Height: Peak Height: FFE: FFE minus 6 feet= (Existing Contour) <br /> Perimeter(linear feet) = 50%= L.F. below grade <br /> Basement? 0 Yes 0 No, Stories <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION: <br /> The distance between the lowest proposed Slab at or above grade— <br /> floor(of the basement or crawl space)and measure from highest existing <br /> START WITH the highest point of the roof. grade to the highest point of the <br /> START WITH roof even if fill was brought in to <br /> elevate home. <br /> If you have a... <br /> SUBTRACTION • GABLE OR HIPPED ROOF(no Slab below grade—measure <br /> (BASED ON windows): Subtract half the distance from highest existing grade to the <br /> ROOF TYPE) between the highest point of the roofhighest point of the roof. <br /> to the low point of the corresponding If you have a... <br /> gable or hipped roof SUBTRACTION • GABLE OR HIPPED ROOF <br /> • GABLE OR HIPPED ROOF(with (BASED ON (no windows): Subtract half <br /> windows): Subtract half the distance ROOF TYPE) the distance between the <br /> between the top of the highest he lowost point of the roof to <br /> t <br /> window and the highest point of the the pointof the <br /> roof corresponding gable or <br /> hipped roof <br /> • ALL OTHER ROOF TYPES(flat, • GABLE OR HIPPED ROOF <br /> mansard,etc):No subtraction. (with windows): Subtract <br /> SUBTRACTION Subtract the distance between the half the distance between <br /> (BASED ON basement/crawl space floor and the the top of the highest <br /> EXISTING highest existing grade adjacent to the window and the highest <br /> GRADES) foundation OR 10 feet(whichever is less). point of the roof <br /> • ALL OTHER ROOF TYPES <br /> (flat,mansard,etc):No <br /> EQUALS Defined building height subtraction. <br /> Defined building height <br /> 1 EQUALS , <br /> • <br /> Updated: October 2015 <br /> z:\forms\plan review checklist 10-2015.docx <br />