My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-P03480 - mechanical
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0795 Old Crystal Bay Road North - 28-118-23-34-0003
>
Permits/Inspections
>
2001-P03480 - mechanical
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:24:38 PM
Creation date
3/14/2018 9:53:58 AM
Metadata
Fields
Template:
x Address Old
House Number
795
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
795 Old Crystal Bay Road North
Document Type
Permits/Inspections
PIN
2811823340003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0.8 <br /> CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 JAN 2 1 1UU1 <br /> GENERAL INFORMATION GI I Y Ur a <br /> 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be <br /> reviewed and a permit will be issued within 2 working days. <br /> 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID <br /> UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS <br /> POSTED ON THE JOB SITE. <br /> 3. Mechanical Designs - Complete calculations, details and specifications are required for each heating, <br /> ventilation, humidification-dehumidification, and air conditioning installation including heat loss/heat gain <br /> calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. <br /> Data shall be presented on form provided. Identification of and specifications for water heating equipment <br /> shall also be provided. <br /> 4. When any new construction or remodeling is involved, a separate building permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code <br /> requirements. <br /> 6. All work must be inspected (rough-in and final). Call 473-7357. 24-hour not'- <br /> 7. House Heating Test Record must be submitted before final. <br /> Instructions Complete all items on this application. Compute the tification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. I, <br /> Please check one: New Addition Repai C` <br /> Residential >< Commercial <br /> JOB SITE: r7Gj 5 .J C2 s"7- 44--- <br /> Owner's <br /> --Owner's Name: o(2-o....10 1 emu- moa— Te eph _. <br /> Mailing Address: City: Zip: <br /> Contractor'sName:f\) /z fin& ;- -•1 i _, TelephoneNumber: L- .- --5c•-7 <br /> Mailing Address: r2._‘ • City: ' r- I44-0,_. Zip: i/4 <br /> SYSTEM DESCRIPTION <br /> HEATING SYSTEMS <br /> Quantity: ( Lr— <br /> Make: <br /> rMake: �J <br /> Model: ( . CGLQ I(-t'- 2x.-2.._ l C-( nAIL ' 4 r <br /> Fuel: r.Oil r ,- t.. r Or' G lL5 ���S. <br /> Flue Size: <br /> Input BTUs: <br /> Output BTUs: (2.._Pip4.a_c-e- boa- r'a. La4-1 co,�oa <br /> CFM: <br /> COOLING SYSTEMS <br /> Quantity: <br /> Make:. <br /> Model: <br /> Tons: <br /> H. Power <br />
The URL can be used to link to this page
Your browser does not support the video tag.