Laserfiche WebLink
. 't • ' 4,p� Cit of Orono ^wp� <br /> Y C> FO��CITY�7SE ONLY <br /> 0 Co P.O.Box 66 1140(P Date Received: �f•1 q•D(p Perm 975g, <br /> 2750 Kelley Parkway r <br /> d Crystal Bay,MN 55323 Amount: S <br /> 4exoe4 (952)249-4600 �p <br /> Approved By: ry�4,4,44f. ❑Charge Plan Review <br /> Recommends: Approval it Denial ❑ <br /> CITY OF ORONO—FIRE ALARM OR <br /> KITCHEN EXTINGUISHER/GENERAL PERMIT <br /> (All permits must be approved by the Fire Marshall and/or Building Official) <br /> 1. All fire alarm systems,voluntary or required by Minnesota State Building Code(MUBC)or <br /> Minnesota State Fire Code(MUFC)shall be installed and maintained as per National Fire Protection <br /> Association(NFPA) 72 and 72E, 1996 edition,National Electrical Code and manufacturers <br /> requirements. <br /> 2. Permits are required for all fire alarm system installations. Permits can be obtained from the <br /> Orono Fire Marshal(952)473-0234 or Orono Building Official at,2750 Kelly Parkway Orono,MN, <br /> phone(952)249-4600. Permits are also available online at:www.ci.orono.mn.us <br /> 3. Two sets of plans and specification sheets shall be submitted to the Orono Fire Marshal for approval <br /> at Icast7 N\orking_dm s before start of installation and shall include: <br /> a. Specification data sheets on all components of system. <br /> b. Floor plans indicating locations of devices,fire alarm control panel, sub-panels,transponders, <br /> enunciator,interconnecting wiring and zoning. <br /> c. Power connections including source and branch circuit data. <br /> d. Type of back up power system. <br /> e. Fire alarm control panel shall be compatible with all devices. <br /> f All components of the system shall be UL or FM listed for their applications. Smoke <br /> detectors shall be listed for commercial/industrial use. <br /> 4. All systems shall be addressable. Smoke detectors shall be photo-electric.No combination <br /> burglar/fire alarm systems are allowed unless approved by the Orono Fire Marshal. <br /> 5. Power supply for the system shall include battery back-up with a UL listed fire alarm panel. Alarm <br /> verification is required for all systems using smoke detectors. <br /> 6. The alarm system shall be audible above the ambient noise level in all areas of the building. <br /> Audio/visual signaling devices are required. <br /> 7. When central station notification is required or provided it must be through a UL or FM listed <br /> communicator or control panel. <br /> 8. If a smoke detecting system installed in the tenant space of a building is directly connected to the <br /> building fire alarm panel,then <br /> a. A zone on the alarm panel must identify the tenant space or zone of the building that the <br /> system is located(i.e.,second floor,west wing). <br /> b. A visual annunciation light shall be installed on the corridor side of the main door of the <br /> tenants space and activate when the detection system in the tenants space activates. <br /> 9. The system shall be tested in the presence of the Orono Fire Marshal for final approval. The test will <br /> include: <br /> a. Random testing of system devices. <br /> b. Random testing for system trouble and ground fault trouble. <br /> c. Correct operation of back-up power system. <br /> 6/1/2004 <br />