Laserfiche WebLink
��� `` 1301 L'Orient Street <br /> �. We. WA IM St.Paul,Minnesota 55117 <br /> AUTOMATIC SPRINKLER CO. (651)558-3300 • (800)229-6263 <br /> Setting The Standard... Fax: (651)558-3310 <br /> SHEET 2 i 2-Use separate sheet for each system inspected System No.or!Description if multiple <br /> ! <br /> systems • Lc1 Q ie <br /> Inspection Report <br /> No.01/355/ <br /> 11 Date dry-pipe valve trip tested(control valve partially open) /l/iff (See Trip Test Table which follows) <br /> 12 Date dry-pipe valve trip tested(control valve fully open) /t/ (See Trip Test Table which follows) <br /> 13 Date quick-opening device tested Ai A (See Trip Test Table which follows) <br /> DRY VALVE TRIP TEST TABLE Q.O.D. <br /> MAKE MODEL SERIAL NO. MAKE MODEL SERIAL NO. <br /> DRY PIPE Time to Trip Water Air Trip Point Time Water Reached Alarm Operated <br /> OPERATING Thru Test Pipe Pressure Pressure Air Pressure Test Outlet Properly <br /> TEST MIN. SEC. PSI PSI PSI MIN. SEC. YES NO <br /> Without <br /> Q.O.D <br /> With <br /> Q.O.D <br /> 14 Date deluge or preaction valve tested N 4 (See Trip Test Table which follows) <br /> TRIP TEST TABLE <br /> Operation n PNEUMATIC o ELECTRIC ❑HYDRAULIC <br /> Piping Supervised o YES ❑ NO Detecting Media Supervised o YES ❑ NO <br /> DELUGE& Does valve operate from the manual trip and/or remote control stations ❑ YES ❑ NO <br /> PREACTION Is there an accessible facility in each circuit for testing ❑ YES ❑ NO Method of Testing Circuits <br /> VALVES Does each circuit operate Does each circuit Maximum time to <br /> MAKE MODEL supervision loss alarm operate valve release operate release <br /> YES NO YES NO YES NO <br /> 15 See Control Valve Maintenance Table <br /> CONTROL VALVE MAINTENANCE TABLE <br /> Explain <br /> Abnormal <br /> Control Valves Number Type Open Secured Closed Signs Condition <br /> City Control Valves <br /> Bypass Valves <br /> Tank Control Valves <br /> Pump Control Valves <br /> Sectional Control Valves <br /> System Control Valves /..1/ rt A F irp 4 t71 < tA'< <br /> Other Control Valves <br /> Kitchen Control Valves <br /> 16 Water Flow Test at Sprinkler Riser // 1/ <br /> Water Supply Source: &Go Tank Pump <br /> Residual <br /> Test Pipe Size of Static (Flow) <br /> Date Location Test Pipe Pressure Pressure <br /> Last Water Flow Test /d`/j.09 2 e SQ1�. 2°' ga Q <br /> This Water Flow Test /D DSS n I S ail 2.If <br /> 5 <br /> 17 Explain any"No"answers and comments: <br /> 18 Adjustments or cArrection made during this inspection: a k (9.0 e D A)t-i2 o( L1 A I Ut S - <br /> ....-c t. o c k4., .41,f 4,...s 1 5, GAir? L5 <br /> 19 Although these comments are not the result of an engineering review,the following desirable improvements are recommended: <br /> Signature: 7 4 55 _ . 4.4J2Date: /0- /'7O ' <br /> (Rev.2/8/06) <br />