Laserfiche WebLink
A 1301 L'Orient Street <br /> IC....1,111 <br /> . • St.Paul,Minnesota 55117 <br /> AUTOMATIC SPRINKLER CO. (651)558-3300 • (800)229-6263 <br /> Setting The Standard.... Fax: (651)558-3310 <br /> SHEET 2 of 2-Use separate sheet for each system inspected System No.or Description if multiple <br /> systems / Gtr Q 7 <br /> Inspection Report <br /> No. ‘229--/-13 <br /> 13 <br /> 11 Date dry-pipe valve trip tested(control valve partially open) /OA- (See Trip Test Table which follows) <br /> 12 Date dry-pipe valve trip tested(control valve fully open) )A.- (See Trip Test Table which follows) <br /> 13 Date quick-opening device tested 3 4. (See Trip Test Table which follows) <br /> DRY VALVE TRIP TEST TABLE Q.O.D. <br /> MAKE MODEL SERIAL NO. MAKE MODEL SERIAL NO. <br /> DRY PIPE Time to Trip Water Air Trip Point Time Water Reached Alarm Operated <br /> OPERATING Thru Test Pipe Pressure Pressure Air Pressure Test Outlet Properly <br /> TEST MIN. SEC. PSI PSI PSI MIN. SEC. YES NO <br /> Without <br /> Q.O.D <br /> With <br /> Q.O.D <br /> 14 Date deluge or preaction valve tested l.) /9-- (See Trip Test Table which follows) <br /> TRIP TEST TABLE <br /> Operation ❑PNEUMATIC ❑ELECTRIC o HYDRAULIC <br /> Piping Supervised ❑ YES ❑ NO 'Detecting Media Supervised ❑ YES ❑ NO <br /> DELUGE& Does valve operate from the manual trip and/or remote control stations o YES o NO <br /> PREACTION Is there an accessible facility in each circuit for testing 0 YES o NO 'Method of Testing Circuits <br /> VALVES Does each circuit operate Does each circuit Maximum time to <br /> MAKE MODEL supervision loss alarm operate valve release operate release <br /> YES NO YES NO YES NO <br /> 15 See Control Valve Maintenance Table <br /> CONTROL VALVE MAINTENANCE TABLE <br /> Explain <br /> Abnormal <br /> Control Valves Number Type Open Secured Closed Signs Condition <br /> City Control Valves <br /> Bypass Valves <br /> Tank Control Valves <br /> Pump Control Valves <br /> Sectional Control Valves <br /> System Control Valves #- y t t g Yp S `t 4 T S <br /> Other Control Valves <br /> Kitchen Control Valves <br /> 16 Water Flow Test at Sprinkler Riser <br /> Water Supply Source: ity V " Tank Pump <br /> Residual <br /> Test Pipe Size of Static (Flow) <br /> Date Location Test Pipe Pressure Pressure <br /> Last Water Flow Test i0- / dR R_ / s 02 JC.._ oZ t (a O <j <br /> This Water Flow Test /045,- R ; 5 0 2 2 " S, 5C1 <br /> 17 Explain any"No"answers and comments: <br /> 18 Adjustments or collections made during this inspection: • C.adi A; t e_0 c G oti ig a( i 1 A I S <br /> —r G e c ks Pci/ .4 L.ol A. p-1 c 1 •5,,Aim'5 <br /> 19 Although these comments are not the result of an engineering review,the following desirable improvements are recommended: <br /> Signature: 14.4..... "—c„,4 .y tj Date: /6 -lc.- OQ <br /> (Rev.2/8/06) <br />