Laserfiche WebLink
Q3-09-'18 07:56 FROM- T-627 P0002/0004 F-083 <br /> MECHANICAL SYSTEMS BEIK INSTALLED • <br /> Note:All Geothermal Systems will now require a Site Plan&Review by our Building Official. <br /> IS THIS GEOTHERMAL? ❑Yes ❑No <br /> HEATING SYSTEMS <br /> Quantity: <br /> Make: <br /> Model: <br /> Fuel: <br /> Flue Site: <br /> Input BTUs: <br /> Output BTUs: <br /> CFM: <br /> COOLING SYSTEMS <br /> Quantity: <br /> Make: <br /> Model: <br /> Tons: <br /> H.Power <br /> 'kl.I? c>:oEY: pI l h5 i' ') t4ii" ) (.`'''`01`77) <br /> ❑ 'Wood.Burnirt Fitt lacq _ _ <br /> ❑ Wood.StoV'e with Flue/Riesonri) <br /> VENTILATION <br /> ❑ No. Kitchen Exhaust duct recirculating cfm <br /> ❑ No. Bath Exhaust(must have duct outside) cfm <br /> ❑ No, Other Fans: Locations cfm <br /> FUEL STORAGE (Must be approved by The Marshall if proposing to abandon lank in place.) <br /> ❑ Installation ❑ Removal <br /> Fuel Oil: gallons ❑ Underground 0 Inside ❑Outside <br /> LP Gas: gallons <br /> Other: <br /> GAS LINE ONLY <br /> ❑ Outdoor Grill ❑ Other/List What&Where: <br /> 2 <br />