My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-00030 - new commercial structure
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0550 Old Crystal Bay Road North - 33-118-23-13-0021
>
Permits/Inspections
>
2008-00030 - new commercial structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:47:47 PM
Creation date
3/12/2018 1:20:53 PM
Metadata
Fields
Template:
x Address Old
House Number
550
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
550 Old Crystal Bay Road North
Document Type
Permits/Inspections
PIN
3311823130021
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV <br /> i 1 <br /> COMcheck Software Version 3.5.3 <br /> Envelope Compliance Certificate <br /> Minnesota Commercial Code <br /> Report Date: 07/07/08 <br /> Data filename: R:\0905\905_300\905-364 Crystal Bay BC-Bldg B\energy calculations\cbbc building b_Building.CCK.cck <br /> Section 1: Project Information <br /> Project Type: New Construction <br /> D CUP . <br /> Project Title : Crystal Bay business center-building b <br /> Construction Site: Owner/Agent: Designer/Contractor: <br /> Orono,MN MN Tom Roszak <br /> Ryan Companies US, Inc. <br /> 50 South 10th Street <br /> Suite 300 <br /> Minneapolis,MN 55403 <br /> Section 2: General Information <br /> Building Location(for weather data): Hennepin,Minnesota <br /> Climate Zone: 15 <br /> Heating Degree Days(base 65 degrees F): 8499 <br /> Cooling Degree Days(base 65 degrees F): 673 <br /> Vertical Glazing/Wall Area Pct.: 18% <br /> Building type Floor Area <br /> Offices:10,001-25,000 ft2 19200 <br /> Section 3: Requirements Checklist <br /> Envelope PASSES:Design 8%better than code. <br /> Climate-Specific Requirements: <br /> Component Name/Description Gross Area Cavity Cont. Proposed Budget <br /> or Perimeter R-Value R-Value U-Factor U-Factor <br /> Roof 1:Non-Wood Joist/Rafter/Truss 40027 0.0 22.5 0.043 0.045 <br /> Exterior Wall 1:CMU>8"with Empty Cells, Furring:Metal 9038 0.0 13.0 0.063 0.068 <br /> Window 4:Metal Frame with Thermal Break:Double Pane with 3336 --- --- 0.400 0.520 <br /> Low-E,Tinted,SHGC 0.70 <br /> Door 1:Solid 105 --- --- 0.280 0.113 <br /> Door 3:Overhead 408 --- --- 0.110 0.113 <br /> Exterior Wall 2:CMU>8"with Empty Cells, Furring:None 9038 --- 3.0 0.170 0.068 <br /> (a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. <br /> Air Leakage, Component Certification, and Vapor Retarder Requirements: <br /> D 1. All joints and penetrations are caulked,gasketed,weather-stripped,or otherwise sealed. <br /> D 2. Windows,doors,and skylights certified as meeting leakage requirements. <br /> j 3. Component R-values&U-factors labeled as certified. <br /> j 4. Insulation installed according to manufacturer's instructions,in substantial contact with the surface being insulated,and in a manner that <br /> achieves the rated R-value without compressing the insulation. <br /> j 5. Vapor retarder installed. <br /> Section 4: Compliance Statement <br /> Project Title: Crystal Bay business center-building b Report date: 07/07/08 <br /> Data filename: R:\0905\905_300\905-364 Crystal Bay BC-Bldg B\energy calculations\cbbc building b_Building.CCK.cck Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.