Laserfiche WebLink
Rrvgl 161 C-,o <br /> B°' <br /> CITY OF ORONO APPLICATION FOR DEMOLITION PERMIT <br /> P.O. Box 66 (2750 Kelley Parkway) <br /> Crystal Bay,MN 55323 <br /> SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT <br /> General Instructions <br /> 1. You may be required to obtain other permits, i.e. well abandonment, etc. <br /> 2. Work must not begin unless the permit card is available on the job site. <br /> 3. A 24 hour notice is reuire all inspections. Call (952) 249-4600. <br /> JOB SITE ADDRESS: - <: it) 2 J Z-4-/' R/ v d <br /> Occupancy Type: Residential Commercial <br /> OWNER'S NAME: tie/ G4 Pi f'�-- Phone: 9S2 -976 —02.43 7 <br /> Mailing Address: Po eo,e 3 7 S City: Lo N 4 LA--«� <br /> CONTRACTOR'S NAME: <l 4 d,0„s Bus.No.: 743^'7,027/0 <br /> Mailing Address:� 3.3 city: De /ahp / � u.s,53 g <br /> Demolition if planned by means of: manual disassembly <br /> Xheavy equipment <br /> Permits Issued: <br /> # Well Abandonment <br /> In return for issuance of said Demolition Permit, the undersigned owner hereby agrees as follows: <br /> 1. The structure(s) shall be kept enclosed and/or secured until such time as demolition is <br /> complete. <br /> 2. Demolition debris will be kept off adjoining property and/or the public rights-of-way unless <br /> specific prior approval is obtained in writing for temporary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in accordance with all <br /> applicable PCA requirements. <br /> 5. Water wells must be abandoned in accordance with State Health Department regulations. <br /> 6. Sewer and water must be disconnected at the services at the street by qualified contractors. <br /> 7. Inspection required when all debris has been removed, before backfilling. <br />