My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#5505-site plan/CUP-2006
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0450 Old Crystal Bay Road North - 33-118-23-13-0020
>
Resolutions
>
#5505-site plan/CUP-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:47:40 PM
Creation date
3/9/2018 12:45:33 PM
Metadata
Fields
Template:
x Address Old
House Number
450
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
450 Old Crystal Bay Road North
Document Type
Resolutions
PIN
3311823130020
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f; <br /> ---citt)--0-11 <br /> --;,1'\9....,,e- <br /> t( . <br /> =. 9�s e- CITYofORONO <br /> ,tL ; *4.1 '.1: ,1G RESOLUTION OF THE CITY COUNCIL <br /> �kESH�4 NO. 5 5 0 5 <br /> 4. Before the first new building is occupied the drainage from the existing <br /> parking lot onto property in the Orono Industrial Park subdivision shall be <br /> redirected to remain within the Applicant's property until it enters the <br /> drainage system. <br /> 5. The new shoulder and re-striping of Old Crystal Bay Road shall be <br /> completed before the first new building is occupied. <br /> 6. The conditional use permit for outdoor storage (#01-2612) shall be revised <br /> to relocate the outdoor storage prior to construction of the new street or <br /> issuance of a building permit for Lot 1 Block 1. <br /> 7. The applicant shall execute a Developer's Agreement for construction of <br /> the on-site improvements as set forth therein. This Developer's Agreement <br /> shall define site access required during construction. (This Developer's <br /> Agreement and the Developer's Agreement for the plat of Crystal Bay <br /> Business Center shall be combined into one agreement.) <br /> 8. No land alterations shall take place until erosion control is established and <br /> a building, demolition or land alteration permit has been issued. No <br /> improvements shall begin until the appropriate permit has been issued. A <br /> Letter of Credit must accompany the building permit application written to <br /> 125% of the City Engineer's estimated cost of the proposed on-site <br /> improvements for that lot and any required improvements on other lots <br /> within the subdivision. <br /> 9. Authorities granted by this resolution run with the property not with the <br /> applicant, but are permissive only and must be exercised by obtaining a <br /> building permit for construction of one of the new buildings within one <br /> year of filing of the final plat and permits for construction of the other two <br /> new buildings within five years of the issuance of the permit for the first <br /> building. <br /> 10. Violation of or non-compliance with any of the terms and conditions of <br /> this resolution shall constitute a violation of the zoning code, shall <br /> automatically terminate any authority granted herein, and shall be <br /> punishable as a misdemeanor. <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.