My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info including septic design
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0365 Old Crystal Bay Road North- 33-118-23-31-0013
>
Septic
>
septic info including septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:49:23 PM
Creation date
3/7/2018 12:42:33 PM
Metadata
Fields
Template:
x Address Old
House Number
365
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
365 Old Crystal Bay Road North
Document Type
Septic
PIN
3311823310013
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> S-P TESTING, INC. "ttevenb. Sc irmers - MPCA Cert.No. 627 <br /> 951 Katydid Lane NE - St. Michael MN 55376 - (763) 497-3566 <br /> FAX (763)-497-5011 <br /> State License#394 <br /> I <br /> June 16, 2003 <br /> MN/DOT <br /> 365 Old Crystal Bay Rd. <br /> Parcel 16 - East 1/2 <br /> Orono, Henn. Co., MN <br /> This on-site sewage treatment system is designed for a Type , five bedroom home, in <br /> accordance with the Minnesota Pollution Control Agency Cha ter 7080 and local <br /> ordinances. <br /> The soils on this site are a clay loam. The seasonally saturate soils were located at <br /> 16"to 26" (mottled soil). Due to the seasonally saturated soils,',a Pressurized Mound <br /> System will need to be installed to treat septic effluent. The bottom of the rock must be <br /> located at least 3' above the saturated soils. <br /> The soils at a depth of 12" have a percolation rate of 14.1 mpi. <br /> A pumping chamber will need to be installed to lift the effluent to the treatment area. <br /> The power supply and switches must be located outside the manhole and pumping <br /> chamber in a weather proof enclosure. A warning device must be installed with a light <br /> and sound device, this is in case of a pump failure. <br /> The manifold and supply line pipe must have back drainage to thepumping chamber. <br /> The distribution pipes shall have their ends capped. Be sure the r ck and sand fill <br /> material are clean. The sod layer below the entire mounded area ust be turned over, <br /> just break up the sod, be sure not to over work. I <br /> All neighboring wells are located greater than 100' away from the ro osed treatment <br /> 9 9 9 Y proposed <br /> area. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.