Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
'j <br /> 98 WALLS <br /> STEPS 1,2,3 INNER WALL IS FRAMED ON STE 19 AIR/VAPOR BARRIER STRIP IS ATTACHED, <br /> PLATFORM,AIRNAPOR BARRIER;IS SEALED,AND COVERED WITH <br /> STAPLED ON,THEN SHEATHING IS TAR PAPER <br /> APPLIED <br /> 441, <br /> r " <br /> 4 OUTER WALL IS FRAMED ON 10,11 SECOND FLOOR IS FRAMED, <br /> TOP OF INNER WALL LEAVING SPACE FOR JOIST HEADER r <br /> INSULATION,AND THE AIR/VAPOR <br /> BARRIER IS WRAPPED ONTO FLOOR. ' <br /> KW <br /> I <br /> .'; <br /> r� <br /> 12 SECOND STORY WALL IS FRAMED, a <br /> 5,6,7 OUTER WALL IS SPACED 31/2"-51/2" SEE STEPS 1-7 <br /> FROM INNER WALL AND TOP AND BOTTOM <br /> PLYWOOD PLATES ARE APPLIED. <br /> MM- <br /> i. <br /> 13 <br /> WALL ASSEMBLY IS TILTED INTO <br /> POSITION AND RIGID INSULATION IS <br /> WALL ASSEMBLY IS TILTED INTO APPLIED TO JOIST HEADER <br /> POSITION,AND AIRNAPOR BARRIER IS <br /> SEALED AND STAPLED <br /> r <br /> Figure 7 23 Double-wall construction sequence— <br /> Figure 7.22 Double-wall construction sequence—first story. second st)ry. <br /> y7. <br />