Laserfiche WebLink
OF ORONO Permit f <br /> YSTEM APPROVAL Fee $ <br /> Entered By <br /> krsponsible <br /> Qener-a'1 Contractor will be given a copy of this report and is <br /> for its distribution to all sub-contractors. SEPTIC SYSTEM <br /> DESIGN IS NOT CONSIDERED AS APPROVED UNLESS THIS SHEET IS ATTACHED. <br /> LOCATION: <br /> GENEF2AT. CONTRACTOR: PHONE <br /> SEPTIC CONTRACTOR: PHONE: <br /> OWNER: / -PHONE: <br /> APPROVED <br /> EJ CONDITIONALLY APPROVED: (Note Changes Below) <br /> COMMENTS: <br /> approvaTO l of jtheAInspector (473 7357)5 Call for- inspe tions 24 hoursto the aT)r)roved plans and pinsadvance have prior <br /> NOTICE TO GENERAL CONTRACTORS: Primary and alternate drainfield sites MUST be protected <br /> prior to and after system installation to avoid compaction of the natural soil. <br /> I'1:I EI.^. AREAS MUST BE FEN=' OFF prior to building site excavation and fencing must <br /> remain in place until final site grading. Approval to pour footings will not be granted <br /> until the Inspections Department has verified that primary and alternate sites are <br /> adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed <br /> within 20' of tested drainfield sites either before or after system construction. This <br /> applies to the lot you are working on and all adjacent lots. You could be held liable for <br /> damaging sites on neighboring lots. <br /> VEHICULAR TRAFFIC CAN CAUSE SOIL COMPACTION, RENDERING DRAINFIELD SITES UNUSABLE. <br /> Evidence of traffic on drainfield sites may be cause for revocation of building permits. <br /> Damaged alternate sites must be replaced before a Certificate of Occupancy will be issued. <br /> Date Approved B ity of Orono <br />