Laserfiche WebLink
PASSIVE MAKE-UP AIR OPENING SCHEDULE <br /> TABLE FOR SIZING PASSIVE MAKE-UP AIR OPENINGS Diameter Path 0 Path 1 Path 2 <br /> Notes: a) This table assumes 20 feet of smooth unobstructed round 3 inches 50 cfm 35 cfin 15 cfm <br /> duct with three 90°elbows and a screened hood 4 inches 90 cfm 60 cfm 30 cfm <br /> b) Equivalent designs calculated using pressures of 50 Pascals 5 inches 140 cfm 100 cfin 45 cfm <br /> for Path 0, 25 Pascals for Path 1, and 5 Pascals for Path 2 6 inches 200 cfm l40 cfm 65 cfin <br /> may be used. 7 inches 270 cfm 190 cfm 85 cfm <br /> c) If a make-up air opening is used with no duct or elbows,the 8 inches 350 cfm 250 cfm 110 cfm <br /> Diameter can be decreased by 1 inch. 9 inches 450 cfin 320 cfm 140 cfm <br /> d if flex duct is used,increase diameter b 1 inch. 10 inches 570 cfin 400 cfm 180 cfm <br /> Make-u Air A lication/Location CFM enin size Duct T e <br /> ❑ Smooth ❑ Flex ❑O enin onl <br /> ❑ Smooth ❑ Flex ❑ enin onl <br /> ❑ Smooth ❑ Flex ❑ enin onl <br /> ❑ Smooth ❑Flex ❑ enin onl <br /> AGGREGATE MAI�E-UP AIR WORKSHEET <br /> INSTRUCfIONS <br /> Step 1. Complete Exhaust Schedule on the right indicating cfrn of largest device in each category. EXj-jAUST SCH�'DULE <br /> Step 2. Complete the Combustion Equipment Schedule on preceding page. DEVICE CFM <br /> Step 3. Choose a path with a Y(Yes)for all selected equipment. Clothes d er <br /> Step 4. Complete Aggregate Make-up Air table below for chosen path.Using the total cfm from the Kitchen exhaust <br /> Exhaust Schedule,indicate flow in cfm for proposed method(s)of providing make-up air. Othet exhaust <br /> Step 5. Fill out the Passive Make-up Air Opening Schedule above. TOTAL <br /> ❑ Path 0 —Aggregate Make-up Air Method Passive Passive Powered Make-up <br /> Infiltration enin <br /> Passive infiltration forup to 425 cfm <br /> Passive openings for cfms over 425 <br /> Powered to match flow for cfms over 985 <br /> ❑ Path 1 —Aggregate Make-up Air Method Passive Passive Powered Make-up <br /> Infiltration enin * <br /> Passive infiltration up to 175 cfin* <br /> Passive openings for cfms over 175 <br /> Powered to match flow for cfins over 565 <br /> * If a closed controlled solid-fuel buming appiiance is installed in Path 1,then a passive opening must be installed to provide make-up air for <br /> the clothes dryer and for any central vacuum that exhausts to the outside. <br /> ❑ Path 2 —Aggregate Make-up Air Method Passive Passive Powered <br /> Infiltration enin Make-u <br /> Passive openings for up to 175 cfm <br /> Powered to match flow for cfms over 175 N/A <br /> ❑ Path 3 — Aggregate Make-up Air Method Passive Passive Powered <br /> Infiltracion enin Make-u <br /> Powered to match flow N/A N/A <br /> 15 <br />