My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-25-2016 Council Work Session Packet
Orono
>
City Council
>
2016
>
04-25-2016 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 4:12:50 PM
Creation date
3/2/2018 10:05:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mill and <br />Overlay <br />$ 277,361 <br />Casco Circle, Tamarack Dr., Hunter Dr. <br />Deferred <br />TOTAL <br />$ 502,917 <br />$ 32,558 <br />b. Other Maintenance Projects For Consideration, <br />preventive maintenance dollars could be allocated towards. <br />that require Mill and Overlay. <br />5. Reconstruction and Construction for 2016. <br />There are numerous other roads that <br />Exhibit B contains a listing of all of the roads <br />a. City Streets Proposed for Reconstruction <br />in 2016 Public Works Plan. <br />Project <br />Estimated <br />Cost <br />Status <br />Watertown Road Phase 2 <br />$ 32,558 <br />City section of larger MSA project. Bids complete. <br />Pending Award <br />Watertown Road w/Long Lake <br />$ 123,759 <br />Bids complete. Pending Award <br />Fox Street Feasibility Study <br />$ 24,000 <br />Approved. Scheduled for Summer 2016. <br />West Lafayette <br />$ 143,117 <br />Deferred <br />TOTAL <br />$ 323,434 <br />Varies <br />b. MSA Streets Proposed for Reconstruction in 2016 Public Works Plan. <br />Project <br />Estimated <br />Cost <br />Status <br />Watertown Road Phase 2 <br />$ 699,485 <br />Bids complete. Pending Award <br />C. Other Projects for Consideration. In addition to the projects proposed in the 2016 Public <br />works plan the following projects should be considered. <br />Project <br />Estimated <br />Cost <br />Description <br />Turn Lane on northbound Old <br />$ 47,880 <br />The Orono School District is interested in improving <br />Crystal Bay Road at the Middle <br />traffic flow into the through their campus. The district <br />School. <br />has contracted for a traffic study. If the study supports <br />it one action that could be completed this year would be <br />the construction of a turn lane. <br />Other Roads requiring <br />Varies <br />Exhibit B contains a listing of all of the roads deemed <br />reconstruction. <br />in the PMP as needed reconstruction. <br />Request: <br />1. Direction on how to provide reliable funding for the City's streets as part of the 2016 and beyond <br />budget processes. <br />2. Direction on which projects to complete with funds available in 2016. <br />
The URL can be used to link to this page
Your browser does not support the video tag.