Laserfiche WebLink
consistently offset the operating losses. This has resulted in a positive operating cash flow for the <br />fund. The 2018 budget is being presented with a rate increase of 4%. <br />The single largest expense for the sewer fund is the Met Council disposal charges. The past two years <br />have seen increases in the amounts of $37,410 (9.5%) and 41,277 (9.6%) respectively. As has been <br />discussed with the Council during previous budget processes, heavy rains and high water tables <br />increase the flow through the MCES lift stations and increase our disposal charges. <br />The total operating expenditure budget is increasing by $78,881 (5.8%) The major increases are the <br />previously mentioned MCES charges ($41,277), repairs and maintenance for sewer lines ($13,220) <br />and the non-cash expense of depreciation ($15,000). The revenues are calculated with a 4% increase <br />in the sewer rates as called for in the 2014 rate study. The operating transfer is to cover the sewer <br />improvements that were part of the Casco Point project and will continue for another six years. <br />Upcoming capital expenditures can be covered by the fund's current cash balances. Projects <br />identified in the CIP for 2018 include: Annual sewer rehabilitation ($273,182), Sewer televising <br />($47,272), additional generators ($75,000), lift station updates ($112,000); lift station monitoring <br />improvements ($26,000), sewer main replacements ($353,740), and a generator rehabilitation <br />($10,000), for a total of $972,194. The current cash balance for the fund is $2,800,000. <br />Ctarm Water <br />The Stormwater Fund is for the most part project based. Operating expenditures are mainly limited <br />to engineering associated with NPDES, SWPPP and other state and federal requirements. Public <br />Works time and materials spent on culvert cleaning/replacement are also charged to this fund. The <br />purpose of this fund is to collect money for the larger Stormwater projects that will be required in the <br />future. The revenue in the attached budget is calculated with a 10% increase in the rates. This is the <br />annual increase required to avoid future special assessments for stormwater projects. Potential CIP <br />projects in 2018 include: Long Lake Ravine Stabilization (SWMP 7); System improvements <br />performed with road projects; TMDL Updates. The capital expenditures total $308,080. The funds <br />current cash balance is $1,700,000. <br />Recycling <br />The recycling fund was newly created in 2013. Its major expenditure line is for contracted <br />recycling charges. The current contract with Waste Management is capped at a 2.8% increase. In <br />November of 2016 and continuing through 2017, the City has been receiving a Recycling Materials <br />Offset. In previous years, this offset had not been paid because there was no market for the <br />recycled materials. With the return of the offset, the budget has been prepared with no increase in <br />recycling rates. The full time wages that are charged to the fund represent 10% of the City Clerks <br />wages. The current cash balance is $49,673. <br />Cable <br />The Cable fund was new for the 2015 budget. The projected revenues are based on current <br />subscriber information and rates. The line item for Internet/Other communications covers the costs <br />associated with streaming and online access of council meetings. It has been increased to pay for <br />the increased cost of our fiber internet connection. <br />