Laserfiche WebLink
C:\Userstm aas\Desktop\9275_SEQ_Transport.)dsx <br />SRF Consulting Group, Inc. <br />By: BJM <br />CKD BY: AK <br />ENGINEER'S ESTIMATE OF PROBABLE CONSTRUCTION COST <br />Wayzata Blvd (CSAH 112) - Phase 2 <br />Hennepin County Proj. No. 091102 <br />90% Cost Estimate <br />NOTES <br />ITEM NO. <br />ITEM DESCRIPTION <br />UNIT <br />UNIT COST <br />PROJECT TOTAL <br />QUANTITY AMOUNT <br />BASE BID <br />STATE AID PARTICIPATING 027-712-002 <br />TURNBACK PARTICIPATING <br />COUNTY (50%) COUNTY (50%) <br />ROADWAY STORM SEWER ORONO (50%) LONG LAKE (50%) <br />SAP 152-020-012 <br />QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT <br />NON PARTICIPATING <br />COUNTY (100%) LONG LAKE (100%) <br />QUANTITY AMOUNT QUANTITY AMOUNT <br />2540.602 <br />INFORMATION SIGN SPECIAL <br />EACH <br />$ <br />15.00 <br />25.00 <br />$ 375.00 <br />$ <br />- <br />25 $ 375.00 <br />$ <br />$ <br />$ <br />$ <br />2545.511 <br />LIGHTING UNIT TYPE SPECIAL 1 <br />EACH <br />$ <br />6,800.00 <br />9.00 <br />$ 61,200.00 <br />9 <br />$ <br />61,200.00 <br />$ - <br />$ <br />$ <br />$ <br />$ <br />2545.515 <br />LIGHT FOUNDATION DESIGN E MODIFIED <br />EACH <br />$ <br />1,230.00 <br />9.00 <br />$ 11,070.00 <br />9 <br />$ <br />11,070.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2545.521 <br />2" RIGID STEEL CONDUIT <br />L F <br />$ <br />27.60 <br />242.00 <br />$ 6,679.20 <br />242 <br />$ <br />6,679.20 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2545.523 <br />2" NON-METALLIC CONDUIT <br />L F <br />$ <br />7.80 <br />1601.00 <br />$ 12,487.80 <br />1601 <br />$ <br />12,487.80 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2545.523 <br />3" NON-METALLIC CONDUIT <br />L F <br />$ <br />9.60 <br />60.00 <br />$ 576.00 <br />60 <br />$ <br />576.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2545.523 <br />4" NON-METALLIC CONDUIT <br />L F <br />$ <br />14.40 <br />56.00 <br />$ 806.40 <br />56 <br />$ <br />806.40 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2545.531 <br />UNDERGROUND WIRE 1 COND NO 2 <br />L F <br />$ <br />3.60 <br />793.00 <br />$ 2,854.80 <br />793 <br />$ <br />2,854.80 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2545.531 <br />UNDERGROUND WIRE 1 COND NO 4 <br />L F <br />$ <br />1.70 <br />7012.00 <br />$ 11,920.40 <br />7012 <br />$ <br />11,920.40 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2545.533 <br />DIRECT BURIED LIGHTING CABLE 4 COND NO 4 <br />L F <br />$ <br />15.50 <br />742.00 <br />$ 11,501.00 <br />742 <br />$ <br />11,501.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2545.541 <br />SERVICE CABINET -TYPE L1 <br />EACH <br />$ <br />4,900.00 <br />1.00 <br />$ 4,900.00 <br />1 <br />$ <br />4,900.00 <br />1 $ <br />$ <br />I $ <br />$ <br />$ <br />2545.545 <br />EQUIPMENT PAD B <br />EACH <br />$ <br />1,180.00 <br />1.00 <br />$ 1,180.00 <br />1 <br />$ <br />1,180.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2545.553 <br />HANDHOLE <br />EACH <br />$ <br />730.00 <br />6.00 <br />$ 4,380.00 <br />6 <br />$ <br />4,380.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2554.501 <br />TRAFFIC BARRIER DESIGN 88307 <br />LF <br />$ <br />30.00 <br />113.00 <br />$ 3,390.00 <br />113 <br />$ <br />3,390.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2554.501 <br />TRAFFIC BARRIER DESIGN B8338 <br />LF <br />$ <br />24.00 <br />1670.00 <br />$ 40,080.00 <br />1670 <br />$ <br />40,080.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2554.509 <br />GUIDE POST TYPE B <br />EACH <br />$ <br />55.00 <br />32.00 <br />$ 1,760.00 <br />$ <br />32 $ 1,760.00 <br />$ <br />$ <br />$ <br />$ <br />2554.521 <br />ANCHORAGE ASSEMBLY - PLATE BEAM <br />EACH <br />$ <br />600.00 <br />3.00 <br />$ 1,800.00 <br />3 <br />$ <br />1,800.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2554.523 <br />END TREATMENT -TANGENT TERMINAL <br />EACH <br />$ <br />2,800.00 <br />7.00 <br />$ 19,600.00 <br />7 <br />$ <br />19,600.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2554.615 <br />IMPACT ATTENUATOR NO 1 <br />AMBY <br />$ <br />1,800.00 <br />24.00 <br />$ 43,200.00 <br />24 <br />$ <br />43,200.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2554.615 <br />IMPACT ATTENUATOR NO 2 <br />AMBY <br />$ <br />12,500.00 <br />1.00 <br />$ 12,500.00 <br />1 <br />$ <br />12,500.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2554.615 <br />RELOCATE IMPACT ATTENUATOR NO 1 <br />AMBY <br />$ <br />500.00 <br />32.00 <br />$ 16,000.00 <br />32 <br />$ <br />16,000.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />(6) <br />2557.501 <br />WIRE FENCE DESIGN 48-9322 <br />LF <br />$ <br />30.00 <br />120.00 <br />$ 3,600.00 <br />120 <br />$ <br />3,600.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2557.523 <br />METAL BRACE ASSEMBLY -CHAIN LINK FENCE <br />EACH <br />$ <br />300.00 <br />2.00 <br />$ 600.00 <br />2 <br />$ <br />600.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2557.527 <br />ELECTRICAL GROUND <br />EACH <br />$ <br />250.00 <br />1.00 <br />$ 250.00 <br />1 <br />$ <br />250.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2563.601 <br />TRAFFIC CONTROL SUPERVISOR <br />LS <br />$ <br />12,500.00 <br />1.00 <br />$ 12,500.00 <br />1 <br />$ <br />12,500.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />(7) <br />2563.601 <br />TRAFFIC CONTROL <br />LS <br />$ <br />75,000.00 <br />1.00 <br />$ 75,000.00 <br />0.79 <br />$ <br />59,250.00 <br />0.08 $ 6,000.00 <br />0.02 $ 1,500.00 <br />0.01 $ 750.00 <br />0.01 $ <br />750.00 0.09 <br />$ <br />6,750.00 <br />2563.602 <br />PORTABLE CONCRETE BARRIER DELINEATOR <br />EACH <br />$ <br />10.00 <br />300.00 <br />$ 3,000.00 <br />300 <br />$ <br />3,000.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2563.602 <br />PORTABLE CHANGEABLE MESSAGE SIGN <br />EACH <br />$ <br />6,000.00 <br />2.00 <br />$ 12,000.00 <br />2 <br />$ <br />12,000.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2563.613 <br />WORK ZONE SPEED LIMIT <br />UDAY <br />$ <br />50.00 <br />214.00 <br />$ 10,700.00 <br />214 <br />$ <br />10,700.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2563.618 <br />CONSTRUCTION SIGN -SPECIAL <br />SF <br />$ <br />19.00 <br />585.00 <br />$ 11,115.00 <br />585 <br />$ <br />11,115.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2564.531 <br />SIGN PANELS TYPE C <br />SF <br />$ <br />33.00 <br />299.10 <br />$ 9,870.30 <br />299.1 <br />$ <br />9,870.30 <br />$ <br />$ <br />$ <br />$ <br />$ <br />- <br />2564.537 <br />INSTALL SIGN TYPE C <br />EACH <br />$ <br />75.00 <br />26.00 <br />$ 1,950.00 <br />23 <br />$ <br />1,725.00 <br />$ <br />$ <br />$ <br />$ <br />3 <br />$ <br />225.00 <br />2564.537 <br />INSTALL SIGN TYPE D <br />EACH <br />$ <br />400.00 <br />1.00 <br />$ 400.00 <br />1 <br />$ <br />400.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />- <br />2564.537 <br />INSTALL SIGN TYPE SPECIAL <br />EACH <br />$ <br />150.00 <br />8.00 <br />$ 1,200.00 <br />8 <br />$ <br />1,200.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2564.602 <br />INSTALL DYNAMIC SPEED DISPLAY SIGN <br />EACH <br />$ <br />2,000.00 <br />1.00 <br />$ 2,000.00 <br />1 <br />$ <br />2,000.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2565.514 <br />TRAFFIC CONTROL INTERCONNECT <br />LS <br />$ <br />83,000.00 <br />1.00 <br />$ 83,000.00 <br />$ <br />$ <br />$ <br />$ <br />1 $ <br />83,000.00 <br />$ <br />2572.501 <br />TEMPORARY FENCE <br />LF <br />$ <br />5.00 <br />160.00 <br />$ 800.00 <br />160 <br />$ <br />800.00 <br />$ <br />$ <br />$ <br />$ <br />- <br />$ <br />2572.502 <br />CLEAN ROOT CUTTING <br />LF <br />$ <br />7.50 <br />550.00 <br />$ 4,125.00 <br />550 <br />$ <br />4,125.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2572.505 <br />PRUNE TREES <br />HOUR <br />$ <br />300.00 <br />40.00 <br />$ 12,000.00 <br />40 <br />$ <br />12,000.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2573.502 <br />SILT FENCE, TYPE SD <br />LF <br />$ <br />22.50 <br />1720.00 <br />$ 38,700.00 <br />1720 <br />$ <br />38,700.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2573.502 <br />SILT FENCE, TYPE MS <br />LF <br />$ <br />2.00 <br />7600.00 <br />$ 15,200.00 <br />7600 <br />$ <br />15,200.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />- <br />2573.530 <br />STORM DRAIN INLET PROTECTION <br />EACH <br />$ <br />225.00 <br />78.00 <br />$ 17,550.00 <br />70 <br />$ <br />15,750.00 <br />$ <br />$ <br />$ <br />$ <br />8 <br />$ <br />1,800.00 <br />2573.533 <br />SEDIMENT CONTROL LOG TYPE STRAW <br />LF <br />$ <br />3.20 <br />4780.00 <br />$ 15,296.00 <br />4780 <br />$ <br />15,296.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />- <br />2573.535 <br />STABILIZED CONSTRUCTION EXIT <br />LS <br />$ <br />8,000.00 <br />1.00 <br />$ 8,000.00 <br />1 <br />$ <br />8,000.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2573.550 <br />EROSION CONTROL SUPERVISOR <br />LS <br />$ <br />30,000.00 <br />1.00 <br />$ 30,000.001 <br />1 <br />$ <br />30,000.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2573.560 <br />CULVERT END CONTROLS <br />EACH <br />$ <br />150.00 <br />13.00 <br />$ 1,950.00 <br />13 <br />$ <br />1,950.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />- <br />2574.508 <br />FERTILIZER TYPE 3 <br />LB <br />$ <br />1.00 <br />1955.00 <br />$ 1,955.00 <br />1945 <br />$ <br />1,945.00 <br />$ <br />$ <br />$ <br />$ <br />10 <br />$ <br />10.00 <br />2574.508 <br />FERTILIZER TYPE 4 <br />LB <br />$ <br />3.00 <br />15.00 <br />$ 45.00 <br />15 <br />$ <br />45.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2574.578 <br />SOIL BED PREPARATION <br />ACRE <br />$ <br />350.00 <br />6.30 <br />$ 2,205.00 <br />6.3 <br />$ <br />2,205.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2575.501 <br />SEEDING <br />ACRE <br />$ <br />250.00 <br />5.30 <br />$ 1,325.00 <br />5.3 <br />$ <br />1,325.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2575.502 <br />SEED MIXTURE 25-131 <br />LB <br />$ <br />3.50 <br />130.00 <br />$ 455.00 <br />130 <br />$ <br />455.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2575.502 <br />SEED MIXTURE 25-141 <br />LB <br />$ <br />4.00 <br />255.00 <br />$ 1,020.00 <br />255 <br />$ <br />1,020.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2575.502 <br />SEED MIXTURE 33-261 <br />LB <br />$ <br />40.00 <br />4.00 <br />$ 160.00 <br />4 <br />$ <br />160.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2575.502 <br />SEED MIXTURE 34-171 <br />LB <br />$ <br />100.00 <br />2.00 <br />$ 200.00 <br />2 <br />$ <br />200.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2575.505 <br />SODDING TYPE LAWN <br />S Y <br />$ <br />6.00 <br />61.00 <br />$ 366.00 <br />$ <br />- <br />61 $ 366.00 <br />$ <br />$ <br />$ <br />$ <br />- <br />2575.505 <br />SODDING TYPE SALT TOLERANT <br />S Y <br />$ <br />5.00 <br />4740.00 <br />$ 23,700.00 <br />4540 <br />$ <br />22,700.00 <br />$ <br />$ <br />$ <br />$ <br />200 <br />$ <br />1,000.00 <br />2575.513 <br />MULCH MATERIAL TYPE 9 <br />C Y <br />$ <br />115.00 <br />10.00 <br />$ 1,150.00 <br />10 <br />$ <br />1,150.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />- <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 0 <br />S Y <br />$ <br />25.00 <br />12710.00 <br />$ 15,252.00 <br />12710 <br />$ <br />317,750.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 3N <br />S Y <br />$ <br />1.60 <br />12250.00 <br />$ 19,600.00 <br />12250 <br />$ <br />19,600.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2575.541 <br />MOWING <br />ACRE <br />$ <br />4,000.00 <br />0.40 <br />$ 1,600.00 <br />0.4 <br />$ <br />1,600.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2575.545 <br />WEED SPRAYING <br />ACRE <br />$ <br />1,000.00 <br />0.40 <br />$ 400.00 <br />0.4 <br />$ <br />400.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2575.571 <br />RAPID STABILIZATION METHOD 3 <br />MGAL <br />$ <br />350.00 <br />55.00 <br />$ 19,250.00 <br />55 <br />$ <br />19,250.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2575.604 <br />SLOPE FACING PROTECTION SYSTEM <br />SY <br />$ <br />50.00 <br />190.00 <br />$ 9,500.00 <br />$ <br />- <br />$ <br />190 $ 9,500.00 <br />$ <br />$ <br />$ <br />2580.601 <br />INTERIM PAVEMENT MARKING <br />LS <br />$ <br />20,000.00 <br />1.00 <br />$ 20,000.00 <br />1 <br />$ <br />20,000.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2582.501 <br />PAVT MSSG PREF THERMO GR IN <br />SF <br />$ <br />30.001 <br />530.00 <br />$ 15,900.00 <br />530 <br />$ <br />15,900.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2582.502 <br />4" SOLID LINE EPDXY GR IN <br />L F <br />$ <br />0.901 <br />7170.00 1 <br />$ 6,453.00 <br />7170 <br />$ <br />6,453.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2582.502 <br />6" SOLID LINE EPDXY GR IN <br />L F <br />$ <br />1.201 <br />11360.00 1 <br />$ 13,632.00 <br />11360 <br />$ <br />13,632.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />PAGE 4 OF 5 Last Update: 04/13/17 <br />