Laserfiche WebLink
C:\Userstm aas\Desktop\9275_SEQ_Transport.)dsx <br />SRF Consulting Group, Inc. <br />By: BJM <br />CKD BY: AK <br />ENGINEER'S ESTIMATE OF PROBABLE CONSTRUCTION COST <br />Wayzata Blvd (CSAH 112) - Phase 2 <br />Hennepin County Proj. No. 091102 <br />90% Cost Estimate <br />NOTES <br />ITEM NO. <br />ITEM DESCRIPTION <br />UNIT <br />UNIT COST <br />PROJECT TOTAL <br />QUANTITY AMOUNT <br />BASE BID <br />STATE AID PARTICIPATING 027-712-002 <br />TURNBACK PARTICIPATING <br />COUNTY (50%) COUNTY (50%) <br />ROADWAY STORM SEWER ORONO (50%) LONG LAKE (50%) <br />SAP 152-020-012 <br />QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT <br />NON PARTICIPATING <br />COUNTY (100%) LONG LAKE (100%) <br />QUANTITY AMOUNT QUANTITY AMOUNT <br />2106.507 <br />EXCAVATION - SUBGRADE <br />(P) <br />C Y <br />$ <br />13.50 <br />24173.00 <br />$ 326,335.50 <br />24173 <br />$ <br />326,335.50 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2106.522 <br />SELECT GRANULAR EMBANKMENT (CV) <br />(P) <br />C Y <br />$ <br />23.00 <br />25200.00 <br />$ 579,600.00 <br />25200 <br />$ <br />579,600.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2106.522 <br />SELECT GRANULAR EMBANKMENT MOD 7% (CV) <br />C Y <br />$ <br />28.00 <br />15561.00 <br />$ 435,708.00 <br />15561 <br />$ <br />435,708.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2106.522 <br />SELECT GRANULAR EMBANKMENT MOD 10% (CV) <br />(P) <br />C Y <br />$ <br />30.00 <br />520.00 <br />$ 15,600.00 <br />520 <br />$ <br />15,600.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2106.523 <br />COMMON EMBANKMENT (CV) <br />(P) <br />C Y <br />$ <br />6.50 <br />13422.00 <br />$ 87,243.00 <br />12931 <br />$ <br />84,051.50 <br />$ <br />491 $ 3,191.50 <br />$ <br />$ <br />$ <br />2118.607 <br />AGGREGATE SURFACING (CV) CLASS 6 <br />(P) <br />C Y <br />$ <br />40.00 <br />200.00 <br />$ 8,000.00 <br />200 <br />$ <br />8,000.00 <br />$ <br />$ - <br />$ <br />$ <br />$ <br />2123.610 <br />STREET SWEEPER (WITH PICKUP BROOM) <br />HOUR <br />$ <br />150.00 <br />180.00 <br />$ 27,000.00 <br />180 <br />$ <br />27,000.00 <br />$ <br />$ - <br />$ <br />$ <br />$ <br />2211.503 <br />AGGREGATE BASE (CV) CLASS 6 <br />(P) <br />C Y <br />$ <br />32.00 <br />10040.00 <br />$ 321,280.00 <br />8880 <br />$ <br />284,160.00 <br />$ <br />580 $ 18,560.00 <br />470 $ 15,040.00 <br />$ <br />110 <br />$ <br />3,520.00 <br />2232.501 <br />MILL BITUMINOUS SURFACE (2.0") <br />S Y <br />$ <br />10.00 <br />380.00 <br />$ 3,800.00 <br />380 <br />$ <br />3,800.00 <br />$ <br />$ - <br />$ <br />$ <br />$ <br />- <br />2360.501 <br />TYPE SP 9.5 WEARING COURSE MIX (2,B) <br />TON <br />$ <br />85.00 <br />270.00 <br />$ 22,950.00 <br />270 <br />$ <br />22,950.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />- <br />2360.501 <br />TYPE SP 12.5 WEARING COURSE MIX (3,C) <br />TON <br />$ <br />70.00 <br />7380.00 <br />$ 516,600.00 <br />7280 <br />$ <br />509,600.00 <br />$ <br />$ <br />$ <br />$ <br />100 <br />$ <br />7,000.00 <br />2360.502 <br />TYPE SP 12.5 NON WEAR COURSE MIX (3,B) <br />TON <br />$ <br />65.00 <br />9400.00 <br />$ 611,000.00 <br />9300 <br />$ <br />604,500.00 <br />$ <br />$ <br />$ <br />$ <br />100 <br />$ <br />6,500.00 <br />(5) <br />2402.583 <br />ORNAMENTAL METAL RAILING TYPE SPECIAL 1 <br />L F <br />$ <br />180.00 <br />410.00 <br />$ 73,800.00 <br />410 <br />$ <br />73,800.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />- <br />(5) <br />2411.511 <br />STRUCTURE EXCAVATION CLASS U <br />C Y <br />$ <br />20.00 <br />887.00 <br />$ 17,740.00 <br />887 <br />$ <br />17,740.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2411.601 <br />RECONSTRUCT WALL <br />LS <br />$ <br />4,500.00 <br />1.00 <br />$ 4,500.00 <br />1 <br />$ <br />4,500.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />(5) <br />2411.618 <br />PREFABRICATED MODULAR BLOCK WALL <br />(P) <br />SF <br />$ <br />52.00 <br />3100.00 <br />$ 161,200.00 <br />3100 <br />$ <br />161,200.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />2451.507 <br />GRANULAR BEDDING (CV) <br />C Y <br />$ <br />25.00 <br />11.20 <br />$ 280.00 <br />$ <br />- <br />11.2 <br />$ <br />280,00 <br />$ <br />$ <br />$ <br />$ <br />2501.515 <br />12" RC PIPE APRON <br />EACH <br />$ <br />500.00 <br />2.00 <br />$ 1,000.00 <br />$ <br />2 <br />$ <br />1,000.00 <br />$ <br />$ <br />$ <br />$ <br />2501.515 <br />15" RC PIPE APRON <br />EACH <br />$ <br />550.00 <br />9.00 <br />$ 4,950.00 <br />$ <br />9 <br />$ <br />4,950.00 <br />$ <br />$ <br />$ <br />$ <br />2501.515 <br />21" RC PIPE APRON <br />EACH <br />$ <br />650.00 <br />1.00 <br />$ 650.00 <br />$ <br />1 <br />$ <br />650.00 <br />$ <br />$ <br />$ <br />$ <br />2501.515 <br />24" RC PIPE APRON <br />EACH <br />$ <br />700.00 <br />4.00 <br />$ 2,800.00 <br />$ <br />4 <br />$ <br />2,800.00 <br />$ <br />$ <br />$ <br />$ <br />2501.515 <br />36" RC PIPE APRON <br />EACH <br />$ <br />1,100.00 <br />1.00 <br />$ 1,100.00 <br />$ <br />1 <br />$ <br />1,100.00 <br />$ <br />$ <br />$ <br />$ <br />2501.515 <br />42" RC PIPE APRON <br />EACH <br />$ <br />1,300.00 <br />2.00 <br />$ 2,600.00 <br />$ <br />2 <br />$ <br />2,600.00 <br />$ <br />$ <br />$ <br />$ <br />2501.525 <br />44" SPAN RC PIPE -ARCH APRON <br />EACH <br />$ <br />1,200.00 <br />2.00 <br />$ 2,400.00 <br />$ <br />2 <br />$ <br />2,400.00 <br />$ <br />$ <br />$ <br />$ <br />2501.569 <br />15" RC SAFETY APRON <br />EACH <br />$ <br />650.00 <br />2.00 <br />$ 1,300.00 <br />$ <br />2 <br />$ <br />1,300.00 <br />$ <br />$ <br />$ <br />$ <br />2501.569 <br />24" RC SAFETY APRON <br />EACH <br />$ <br />750.00 <br />1.00 <br />$ 750.00 <br />$ <br />1 <br />$ <br />750.00 <br />$ <br />$ <br />$ <br />$ <br />2501.602 <br />TRASH GUARD FOR 12" PIPE APRON <br />EACH <br />$ <br />225.00 <br />2.00 <br />$ 450.00 <br />$ <br />2 <br />$ <br />450.00 <br />$ <br />$ <br />$ <br />$ <br />2501.602 <br />TRASH GUARD FOR 15" PIPE APRON <br />EACH <br />$ <br />250.00 <br />4.00 <br />$ 1,000.00 <br />$ <br />4 <br />$ <br />1,000.00 <br />$ <br />$ <br />$ <br />$ <br />2501.602 <br />TRASH GUARD FOR 21" PIPE APRON <br />EACH <br />$ <br />400.00 <br />1.00 <br />$ 400.00 <br />$ <br />1 <br />$ <br />400.00 <br />$ <br />$ <br />$ <br />$ <br />2501.602 <br />TRASH GUARD FOR 24" PIPE APRON <br />EACH <br />$ <br />500.00 <br />1.00 <br />$ 500.00 <br />$ <br />1 <br />$ <br />500.00 <br />$ <br />$ <br />$ <br />$ <br />2502.521 <br />4" TP PIPE DRAIN <br />L F <br />$ <br />7.00 <br />50.00 <br />$ 350.00 <br />50 <br />$ <br />350.00 <br />$ <br />- <br />$ <br />$ <br />$ <br />$ <br />2502.541 <br />4" PERF TP PIPE DRAIN <br />L F <br />$ <br />7.00 <br />8364.00 <br />$ 58,548.00 <br />8364 <br />$ <br />58,548.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />- <br />2503.511 <br />8" PVC SDR 35 SANITARY SEWER PIPE <br />L F <br />$ <br />35.00 <br />620.00 <br />$ 21,700.00 <br />$ <br />- <br />$ <br />$ <br />$ <br />$ <br />620 <br />$ <br />21,700.00 <br />2503.511 <br />8" PVC SDR 26 SANITARY SEWER PIPE <br />L F <br />$ <br />75.00 <br />315.00 <br />$ 23,625.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />315 <br />$ <br />23,625.00 <br />2503.511 <br />4" PVC SANITARY SEWER SERVICE PIPE <br />L F <br />$ <br />30.00 <br />200.00 <br />$ 6,000.00 <br />$ <br />$ <br />- <br />$ <br />$ <br />$ <br />200 <br />$ <br />6,000.00 <br />2503.521 <br />44" SPAN RC PIPE -ARCH SEWER CL IIA <br />L F <br />$ <br />110.00 <br />137.00 <br />$ 15,070.00 <br />$ <br />137 <br />$ <br />15,070.00 <br />$ <br />$ <br />$ <br />$ <br />- <br />2503.541 <br />12" RC PIPE SEWER DES 3006 CL V <br />L F <br />$ <br />40.00 <br />36.00 <br />$ 1,440.00 <br />$ <br />36 <br />$ <br />1,440.00 <br />$ <br />$ <br />$ <br />$ <br />- <br />2503.541 <br />15" RC PIPE SEWER DES 3006 CL V <br />L F <br />$ <br />42.00 <br />4068.00 <br />$ 170,856.00 <br />$ <br />3782 <br />$ 158,844.00 <br />$ <br />$ <br />$ <br />286 <br />$ <br />12,012.00 <br />2503.541 <br />18" RC PIPE SEWER DES 3006 <br />L F <br />$ <br />36.00 <br />106.00 <br />$ 3,816.00 <br />$ <br />106 <br />$ <br />3,816.00 <br />$ <br />$ <br />$ <br />$ <br />- <br />2503.541 <br />21" RC PIPE SEWER DES 3006 <br />L F <br />$ <br />40.00 <br />497.00 <br />$ 19,880.00 <br />$ <br />497 <br />$ <br />19,880.00 <br />$ <br />$ <br />$ <br />$ <br />2503.541 <br />24" RC PIPE SEWER DES 3006 <br />L F <br />$ <br />45.00 <br />202.00 <br />$ 9,090.00 <br />$ <br />202 <br />$ <br />9,090.00 <br />$ <br />$ <br />$ <br />$ <br />2503.541 <br />24" RC PIPE SEWER DES 3006 CL IV <br />L F <br />$ <br />55.00 <br />40.00 <br />$ 2,200.00 <br />$ <br />40 <br />$ <br />2,200.00 <br />$ <br />$ <br />$ <br />$ <br />2503.541 <br />30" RC PIPE SEWER DES 3006 <br />L F <br />$ <br />55.00 <br />301.00 <br />$ 16,555.00 <br />$ <br />301 <br />$ <br />16,555.00 <br />$ <br />$ <br />$ <br />$ <br />2503.541 <br />36" RC PIPE SEWER DES 3006 <br />L F <br />$ <br />70.00 <br />437.00 <br />$ 30,590.00 <br />$ <br />437 <br />$ <br />30,590.00 <br />$ <br />$ <br />$ <br />$ <br />2503.541 <br />42" RC PIPE SEWER DES 3006 <br />L F <br />$ <br />85.00 <br />94.00 <br />$ 7,990.00 <br />$ <br />94 <br />$ <br />7,990.00 <br />$ <br />$ <br />$ <br />$ <br />- <br />2503.601 <br />BY-PASS PUMPING <br />LS <br />$ <br />20,000.00 <br />1.00 <br />$ 20,000.00 <br />$ <br />$ <br />- <br />$ <br />$ <br />$ <br />1 <br />$ <br />20,000.00 <br />2503.602 <br />RECONNECT TO EXISTING SANITARY SEWER SER <br />EACH <br />$ <br />300.00 <br />7.00 <br />$ 2,100.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />7 <br />$ <br />2,100.00 <br />2503.602 <br />CONNECT TO EXISTING SANITARY SEWER <br />EACH <br />$ <br />1,500.00 <br />8.00 <br />$ 12,000.00 <br />$ <br />$ <br />- <br />$ <br />$ <br />$ <br />8 <br />$ <br />12,000.00 <br />2503.602 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />$ <br />700.00 <br />1.00 <br />$ 700.00 <br />$ <br />1 <br />$ <br />700.00 <br />$ <br />$ <br />$ <br />$ <br />- <br />2503.602 <br />8" X 4" PVC WYE <br />EACH <br />$ <br />400.00 <br />7.00 <br />$ 2,800.00 <br />$ <br />$ <br />- <br />$ <br />$ <br />$ <br />7 <br />$ <br />2,800.00 <br />2503.602 <br />PIPE JOINT REPAIR <br />EACH <br />$ <br />7,500.00 <br />4.00 <br />$ 30,000.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />4 <br />$ <br />30,000.00 <br />2503.603 <br />16" SPLIT STEEL CASING PIPE <br />L F <br />$ <br />200.00 <br />20.00 <br />$ 4,000.00 <br />20 <br />$ <br />4,000.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />- <br />2503.603 <br />8" CURED -IN-PLACE PIPE SYSTEM <br />L F <br />$ <br />25.00 <br />950.00 <br />$ 23,750.00 <br />$ <br />- <br />$ <br />- <br />$ <br />$ <br />$ <br />950 <br />$ <br />23,750.00 <br />2503.603 <br />SANITARY SEWER MANHOLE CASTING <br />EACH <br />$ <br />700.00 <br />11.00 <br />$ 7,700.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />11 <br />$ <br />7,700.00 <br />2504.601 <br />TEMPORARY WATER SERVICE <br />LS <br />$ <br />40,000.00 <br />1.00 <br />$ 40,000.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />1 <br />$ <br />40,000.00 <br />PAGE 2 OF 5 Last Update: 04/13/17 <br />