My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-24-2017 Council Work Session Packet
Orono
>
City Council
>
Agenda Packets - Historical
>
1999-2016 Agenda Packets - work sessions
>
2017
>
07-24-2017 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 3:16:46 PM
Creation date
3/2/2018 9:51:40 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO MEMORANDUM <br />DATE: July 24" d, 2017 <br />TO: Orono City Council <br />FROM: Adam Edwards, P.E., Public Works Director / City Engineer <br />RE: Wayzata Blvd (CSAH 112) Design Review <br />1. Purpose. The purpose of this work session item is provide the Council an opportunity to comment on <br />the CSAH 112 Phase 2 design prior to the City Engineer signing the plan set. Kristy Morter, Project <br />Engineer for Hennepin County will be present to answer any reaming questions. <br />2. Background. Hennepin County intends to improve CSAH 112 from Highway 12 to 6th Avenue in <br />joint effort with Long Lake and Orono. The majority of the project is funded with State Turn Back <br />Funding. The overall project is broken into three phases. Currently we are in the design portion of phase <br />two which includes the stretch of CSAH 112 from Wolf Pointe Trail to Wayzata Blvd West. Phase one is <br />under construction and consists of the portion from Willow Drive to Wolf Pointe Trail. Phase three <br />design is due to commence later this summer and consists of the section from Willow Drive to CSAH 6. <br />The Phase 2 design has been underway since 2016. To guide the design choices a Planning Advisory <br />Committee (PAC) was established with members appointed by each of the two cities, Orono and Long <br />Lake, as well as the County. The PAC provide planning guidance to the design team. In addition a <br />technical advisory committee was formed with engineering representation from each city and the county <br />to workout detailed planning. The planning design followed the base guidance set out in the CSAH 112 <br />preliminary design document which was developed by a similar group of representatives from the two <br />cities and county in 2013. <br />The Phase 2 design is at 95% complete and is on schedule to be 100% complete by late -July and ready for <br />signature. Once complete the design will be prepared for bid solicitation. Bids will be solicited this <br />winter with award expected in the early spring. Work on Phase 2 is planned to begin in April of 2018. <br />Throughout the summer and fall the county will continue to negotiate with impacted property owners for <br />any necessary permanent or temporary easements required for construction. Also the County will <br />prepare a joint agreement for the three parties; Long Lake, Orono and Hennepin County; to enter into. <br />The agreement once signed binds the parties to the project and associated costs as well as establishing the <br />future maintenance responsibilities. <br />3. Cost Participation. Based on the 90% design the overall project is estimated at $9,400,00. The <br />estimated Orono cost is $100,000. <br />Attachments <br />Exhibit A. 95% design (digital only on Drop Box) <br />Exhibit B. Engineers Estimate of Probable Construction Cost <br />Exhibit C. Comments for Council on CSAH Phase II <br />
The URL can be used to link to this page
Your browser does not support the video tag.