My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-22-2017 Council Work Session Packet
Orono
>
City Council
>
Agenda Packets - Historical
>
1999-2016 Agenda Packets - work sessions
>
2017
>
03-22-2017 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 3:08:08 PM
Creation date
3/2/2018 9:46:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item 01 — Work Session <br />CITY OF ORONO MEMORANDUM <br />DATE: March 22, 2017 <br />TO: Orono City Council <br />FROM: Adam Edwards, P.E., Public Works Director / City Engineer <br />RE: Wayzata Blvd (CSAH 112) Update <br />1. Purpose. The purpose of this work session item is for Hennepin County Transportation <br />Planning Engineer, Kristy Morter, P.E. and SRF Engineer Nate Will, P.E. will provide the City <br />Council with an update of plans for the reconstruction of Wayzata Blvd (CSAH 112) Phase 2. <br />2. Background. Hennepin County intends to improve CSAH 112 from Highway 12 to 6th <br />Avenue in joint effort with Long Lake and Orono. The majority of the project is funded with <br />State Turn Back Funding. The overall project is broken into three phases. Phase one is due to <br />begin construction this summer and consists of the portion from Willow Drive to Wolf Point <br />Trail. Currently we are in the design portion of phase two which includes the stretch of CSAH <br />112 from Wolf Point Trail to Wayzata Blvd West. <br />
The URL can be used to link to this page
Your browser does not support the video tag.