Laserfiche WebLink
EROSION CONTROL SUPPLEMENTAL INFORMATION FORM <br /> INSPECTION PLAN REQUIREMENTS <br /> 1. Routine Inspections: <br /> • Once every seven days during active construction <br /> • Within 24 hours of a half inch or more precipitation <br /> 2. Completed Field Inspection Reports: <br /> • Reports available within 24 hours of request until MCWD determines project is complete& <br /> stabilized <br /> Failure to submit requested inspection information will result in a site inspection and may be subject to <br /> reimbursement for MCWD staff time. <br /> Who will inspect your site regularly? <br /> NAME: Kevin Mulvaney ORGANIZATION• Custom Pools Q <br /> PHONE: 952-933-2255 ALTERNATE PHONE: <br /> EMAIL: L �' v1S- �pD�s)✓1C C.d"YVl <br /> Where is the concrete washout location? <br /> R OFF SITE OR CONTAINED ON TRUCK <br /> ❑ INDICATED ON SITE PLAN(with required impermeable liner) <br /> ❑ N/A <br /> What is the final stabilization method? <br /> (seed,sod,etc): Sod <br /> 6 inches of topsoil must be addedlreplaced prior to final stabilization <br /> Will protective fencing for retained vegetation be installed? <br /> ❑ YES <br /> 8 NOT APPLICABLE <br /> ❑ OTHER(describe) <br /> I certify that I am familiar with the requirements of the MCWD Erosion Control Rule and that the <br /> proposed activity w' a conducted i compliance with this rule. <br /> 4/12/17 <br /> S' ature of Applicant or Authorized Agent Date <br /> 0 MINNEHAHA CREEK. <br /> WATERSHED DISTRICT <br /> QUALITY OF WATER,QUALITY OF LIFE <br />