Laserfiche WebLink
SPEC'S Page 4 of 5 <br /> [] OWNER DIRECT "Not Included in Contract"ITEMS: <br /> SAWHORSE to assist in schedule coordination <br /> • Light Fixtures, except those specifically listed above <br /> • Wall paper <br /> • Modifications to public utilities <br /> • ABATEMENTS (lead or asbestos) <br /> • Corrections of existing substandard conditions (structural or mechanical) <br /> Owner is responsible for all N.I.C. obligations: <br /> Selections,schedule costs,liabilities and warranty issues. <br /> [] Clean up of building debris at job completion by SAWHORSE. <br /> Dumpster may be left on job site for building debris. <br /> (No tires,appliances or neighbor's mattress). <br /> [] Any yard damage REPAIR including trees, shrubs and all landscaping by OWNER. <br /> [] Satellite bathroom to be used by workers for duration of construction,please designate <br /> preferred site location. <br /> Communication is essential for a successful project. <br /> Project Manager: Brad Schoen (612-363-4611) <br /> Construction Administrator: Tracy Wright(763-533-0352 ext. 241) <br /> Weekend EMERGENCY Pager: 612-527-2590 <br />