My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6835
Orono
>
Resolutions
>
Reso 0001-7499
>
Reso 6800 - 6899 (October 23, 2017 - September 24, 2018)
>
Resolution 6835
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 2:52:07 PM
Creation date
2/27/2018 2:52:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> s� NO. 635 <br /> tgkFS H o�� <br /> 9. Violation of or non-compliance with any of the terms and conditions of this <br /> resolution may result in the termination of any authority granted herein. <br /> C. Plans and Specifications. The following plans and specifications shall be submitted <br /> for review and approval by the City and other appropriate jurisdictions: <br /> 1) Final plans and specifications for all proposed utility lines and services,including <br /> any proposed revisions to existing service facilities. Proposed plans shall be <br /> provided to the City for final review and approval with the Final Plan set. The <br /> Public Works Department and any other pertinent reviewing agencies shall <br /> review and approve all utility improvements. Final sanitary sewer and watermain <br /> plans shall be provided and are subject to approval by the Public Works <br /> Department and City Engineer. <br /> 2) Final Street and Storm Sewer Plans. <br /> 3) Final Grading,Drainage and Erosion Control Plan and SWPPP showing existing <br /> and proposed contours, building locations, elevations, stormwater facilities and <br /> calculations,utilities and erosion control measures to be used during construction. <br /> General Development Plan Approval will not be granted until the Minnehaha <br /> Creek Watershed District has approved the stormwater plans. <br /> 4) Landscaping plan to reflect a more natural pattern of replacement trees, versus a <br /> lineal replacement pattern along the new Bracketts Point <br /> 5) Any additional plans and specifications deemed necessary by the City as review <br /> progresses. <br /> D. Platting Process.Applicant shall complete all requirements for Final Plat Approval as <br /> follows. The following list of final submittals must be submitted to the City <br /> Administrator 2 weeks prior to the regularly scheduled Council meeting on the second <br /> and fourth Mondays of the month. These submittals are as follows: <br /> 1). Record plat drawings in the form of two (3) mylar copies (one copy for the City's <br /> records and one for filing with Hennepin County) and one(1) copy reduced to 1" _ <br /> 200'. Drawing to include: <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.