My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6835
Orono
>
Resolutions
>
Reso 0001-7499
>
Reso 6800 - 6899 (October 23, 2017 - September 24, 2018)
>
Resolution 6835
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 2:52:07 PM
Creation date
2/27/2018 2:52:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNm <br /> y� NO 6 " J Z5 <br /> G <br /> t�kFSH0�� <br /> A.Project Specific Conditions <br /> 1. The applicable general engineering comments and or conditions provided by City <br /> Engineer dated January 9, 2018 attached hereto as Exhibit C shall be suitably <br /> addressed by applicant in the development plan submittal. <br /> 2. Easements shall be provided as required by the City Engineer. <br /> 3. Regardless of timing of construction on lots 1, 2, or 3, Block 1, the Average Lake <br /> Shore Setback shall be 84 feet from the Ordinary High Water line lots on all sides. <br /> The Average Lake Shore for lots in Block 2 shall be as regulated by city code at <br /> time of construction. <br /> 4. Approval of the Final Plat within 1 year of the date of Council approval of the <br /> preliminary plat. <br /> 5. Development shall adhere to the proposed Basic Conservation Design Master Plan. <br /> 6. Significant trees shall be preserved to the extent possible and as shown on the <br /> landscaping plans. <br /> 7. Upon evidence of resettlement history, the developer will contact the city and the <br /> State Historical Preservation Office prior to proceeding. <br /> 8. Additional approvals <br /> a. Vacation of Bracketts Point Road and Sanitary Sewer easement doc 6878945 as <br /> described herein. <br /> 9. The following estimated fees are due at the time of final plat unless otherwise noted <br /> a. Stormwater and Drainage Trunk: The property will be subject to the Stormwater <br /> and Drainage Trunk Fee(SW&DT Fee)of$32,240(Minimum acre per lot(2)times <br /> number of new lots(4)times per acre amount($4,030). <br /> b. Water and Sewer: The costs to relocate the sanitary sewer will be the developers <br /> responsibility. The Metropolitan Council SAC charge which is currently $2,485 <br /> per dwelling unit will be due at the time of building permit for each lot. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.