Laserfiche WebLink
Page—L of <br /> SIDRPT Rev i o/09 <br /> BRAUN <br /> I RITE BTEC Special Inspection Daily Report <br /> City of my'jo <br /> Report No.: Date of This Report: �01221[O <br /> Project Name: ,,,t. L, A4AW Z,4W, Project No.: (3Laf3�_p 2099 J` <br /> Project Address: o&O dw y 17 0 DLO GP.USwft eD- <br /> Client: Client Project No.: <br /> Project Manager: '�'�Y'W kstz Temp/Weather: <br /> Type of Inspection: Inspection Coverage: <br /> ❑ Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑ Special Cases <br /> ca Periodic ❑ Welding& Bolting ❑ Concrete Placement ❑ Fireproofing <br /> ❑ Piles& Piers ❑ Tendon Placement (Soils <br /> Did the architect or engineer authorize changes to city approved plans? Yes ❑ (Listed Below) No ❑ <br /> Description and location of work completed: AiL be6Q onf—SI A 2%44&%nW PC2 ui?Au c�„to G�nC -ro <br /> oPaw-Am Fy4 r- i l Rmw-a.t �1L Aat�v eF emmAjG CoR00% Dhow—Rm614 S , Due To Ai <br /> F,&W PM F. fr F Wftt)ould A=A VMQA[ d&SWXMM tW POST—pbu6J . <br /> List tests performed: <br /> • Are there any discrepancies noted from this day's observations? Yes ❑ No <br /> • Are there any outstanding discrepancies on this project? Yes ❑ No cQ� <br /> • If yes,see attached Summary Sheet. <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable <br /> workmanship provisions f the current IBC,except as noted above. <br /> Signed: Date: �,�� f(O <br /> Print Full Name: t I.D. No.: VO&SK <br /> White copy to Braun Intertec file. Yellow copy to Project Site Representative. <br /> Providing engineering and environmental solutions since 1957 <br />